Jeff Higdon: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (→Notes)  | 
				No edit summary  | 
				||
| (5 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
*$8-11k/month for hauling  | *$8-11k/month for hauling  | ||
*July    | *July    | ||
*https://monolithicdome.com/david-b-south  | *https://monolithicdome.com/david-b-south - David B South.   | ||
*$7k for insulated, 16' diameter dome - with ring foundation and floor, and walls, with aircrete for insulation for foundation - and to build up floor - otherwise it's concrete with styrofoam. They take a cement mixer. Use wood mulch - in mixer so styrofoam goes down into it. Aircrete Harry does the styrofoam concrete. Wood mulch - shredded paper and styrofoam. 32 hours to make one of these domes by Aircrete Harry. You make the air form out of Tyvek. Lay out a patterm of masonite. Lay tyvek on top. 12 pieces stacked. Then you use angle iron, slit part way, as arches. Use a leaf blower. Plus flap on top, that controls the amount of air pressure. Grout - cement + sand stiffens it up. Use 8" styrofoam. Leave blower running until insulation layer is done.  | |||
*3 days for foundation and floor. 1 day form. 2 days insulated concrete. 6 days for a dome.  | |||
*Form - uses rebar stakes - 1" long.  | |||
*8" masonite on top. Lines with Tyvek and polyethylene  | |||
Latest revision as of 23:35, 16 April 2021
See instructors for Summer X 2021
Notes
- $8-11k/month for hauling
 - July
 - https://monolithicdome.com/david-b-south - David B South.
 - $7k for insulated, 16' diameter dome - with ring foundation and floor, and walls, with aircrete for insulation for foundation - and to build up floor - otherwise it's concrete with styrofoam. They take a cement mixer. Use wood mulch - in mixer so styrofoam goes down into it. Aircrete Harry does the styrofoam concrete. Wood mulch - shredded paper and styrofoam. 32 hours to make one of these domes by Aircrete Harry. You make the air form out of Tyvek. Lay out a patterm of masonite. Lay tyvek on top. 12 pieces stacked. Then you use angle iron, slit part way, as arches. Use a leaf blower. Plus flap on top, that controls the amount of air pressure. Grout - cement + sand stiffens it up. Use 8" styrofoam. Leave blower running until insulation layer is done.
 - 3 days for foundation and floor. 1 day form. 2 days insulated concrete. 6 days for a dome.
 - Form - uses rebar stakes - 1" long.
 - 8" masonite on top. Lines with Tyvek and polyethylene