Grid Connection Costs: Difference between revisions
Jump to navigation
Jump to search
(Added a Category to the Page) |
|||
(3 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
=General= | =General= | ||
Sewer and Water | ==Sewer and Water== | ||
<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vSKf5q6dlCriFHBpwuAH2mWK9KzP-7bSWIbQeNAqh5jPYXDaAWphNNN1HhlytMde2BlBRWnIPxhbL9B/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | <html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vSKf5q6dlCriFHBpwuAH2mWK9KzP-7bSWIbQeNAqh5jPYXDaAWphNNN1HhlytMde2BlBRWnIPxhbL9B/embed?start=false&loop=false&delayms=3000#slide=id.g9ce3ce5e77_2_36" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | ||
[https://docs.google.com/presentation/d/1QsGgA03CL3ylB36FWqyTPcD3dctx5EcY1w5fBTJMuQo/edit#slide=id. | [https://docs.google.com/presentation/d/1QsGgA03CL3ylB36FWqyTPcD3dctx5EcY1w5fBTJMuQo/edit#slide=id.g9ce3ce5e77_2_36 edit] | ||
=Electrical= | |||
=Grid Connection Costs for Rural= | =Grid Connection Costs for Rural= | ||
Line 22: | Line 24: | ||
*United pays for first 250 ft, after that it's $8.4 per foot. | *United pays for first 250 ft, after that it's $8.4 per foot. | ||
*Nearest pole is closest house on Frank Ross Rd. (around 2000 ft) - same location our fiver connection was pulled from. That would be $14.7k | *Nearest pole is closest house on Frank Ross Rd. (around 2000 ft) - same location our fiver connection was pulled from. That would be $14.7k | ||
[[Category: Utilities]] |
Latest revision as of 19:41, 27 February 2022
General
Sewer and Water
Electrical
Grid Connection Costs for Rural
Ameren - 2019 - Case for north end of Factor e Farm, Maysville, MO
- Ameren Ameren Construction Line: 314-992-6619
- Ameren Contractor Doug Alberti - 816-629-2835
- Ameren pays for first 1000
- Nearest pole to Seed Eco-Home is by neighbor's barn, between 1600 and 1800 ft from us
- Cost is $8 to $10 per ft (after first 1000 ft) - around $8000. Lowest limit - $4800 - Upper limit - $8k - not counting trenching
- We'd be responsible for trenching from driveway to house
- Our electrician installs meter box - we buy meter
United Electric Co-Op
- Talked to Glenn
- United pays for first 250 ft, after that it's $8.4 per foot.