Grid Connection Costs: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Added a Category to the Page)
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
=General=
=General=
Sewer and Water:
==Sewer and Water==


<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vSKf5q6dlCriFHBpwuAH2mWK9KzP-7bSWIbQeNAqh5jPYXDaAWphNNN1HhlytMde2BlBRWnIPxhbL9B/embed?start=false&loop=false&delayms=3000#slide=id.g9ce3ce5e77_2_36" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html>
<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vSKf5q6dlCriFHBpwuAH2mWK9KzP-7bSWIbQeNAqh5jPYXDaAWphNNN1HhlytMde2BlBRWnIPxhbL9B/embed?start=false&loop=false&delayms=3000#slide=id.g9ce3ce5e77_2_36" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html>


[https://docs.google.com/presentation/d/1QsGgA03CL3ylB36FWqyTPcD3dctx5EcY1w5fBTJMuQo/edit#slide=id.g9ce3ce5e77_2_36 edit]
[https://docs.google.com/presentation/d/1QsGgA03CL3ylB36FWqyTPcD3dctx5EcY1w5fBTJMuQo/edit#slide=id.g9ce3ce5e77_2_36 edit]
=Electrical=


=Grid Connection Costs for Rural=
=Grid Connection Costs for Rural=
Line 22: Line 24:
*United pays for first 250 ft, after that it's $8.4 per foot.
*United pays for first 250 ft, after that it's $8.4 per foot.
*Nearest pole is closest house on Frank Ross Rd. (around 2000 ft) - same location our fiver connection was pulled from. That would be $14.7k
*Nearest pole is closest house on Frank Ross Rd. (around 2000 ft) - same location our fiver connection was pulled from. That would be $14.7k
[[Category: Utilities]]

Latest revision as of 19:41, 27 February 2022

General

Sewer and Water

edit

Electrical

Grid Connection Costs for Rural

Ameren - 2019 - Case for north end of Factor e Farm, Maysville, MO

  • Ameren Ameren Construction Line: 314-992-6619
  • Ameren Contractor Doug Alberti - 816-629-2835
  • Ameren pays for first 1000
  • Nearest pole to Seed Eco-Home is by neighbor's barn, between 1600 and 1800 ft from us
  • Cost is $8 to $10 per ft (after first 1000 ft) - around $8000. Lowest limit - $4800 - Upper limit - $8k - not counting trenching
  • We'd be responsible for trenching from driveway to house
  • Our electrician installs meter box - we buy meter

United Electric Co-Op

  • Talked to Glenn
  • United pays for first 250 ft, after that it's $8.4 per foot.
  • Nearest pole is closest house on Frank Ross Rd. (around 2000 ft) - same location our fiver connection was pulled from. That would be $14.7k