Interior Wall Build Process: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
#Wall Interior 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1. Subfloor is drilled digitally for connection to module 4. | #Wall Interior 1 - foundation 3" PVC stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1. Subfloor is drilled digitally for connection to module 4. |
Latest revision as of 20:31, 4 April 2023
- Wall Interior 1 - foundation 3" PVC stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1. Subfloor is drilled digitally for connection to module 4.