May Production Run: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "=Tasks Remaining= ==Wheel Mounting== *Drill 1-3/8" ends of shafts *Drill 3/4" hole for wheel mounting shafts *Cut wheel mounting gussets *CNC Torch Table Wheel Mounting plates (...")
 
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
See blog post -  http://blog.opensourceecology.org/2011/06/june-1-production-run-update/
Other documentation forthcoming.
[[Category:Production Runs]]
=Tasks Remaining=
=Tasks Remaining=
*Outstanding Parts


==Wheel Mounting==
==Wheel Mounting==
Line 6: Line 15:
*Cut wheel mounting gussets
*Cut wheel mounting gussets
*CNC Torch Table Wheel Mounting plates (12)
*CNC Torch Table Wheel Mounting plates (12)
*CNC Torch Hydraulic motor plates
*CNC Torch Hydraulic motor interface plates (12)
*
*CNC Torch Hydraulic motor plates (12)
 
==Tractor Balance of Frame==
*Main lower hydraulic attachment plates (6 total)
*Main upper hydraulic attachment plates (6 total)
*Prepare valve mounting bar
*Torch holes for Loader bars
*Prepare loader bars
*Loader cross support hole drilling


==Hydraulics==
==Holepuncher==
*Eyes for QA plates
*Eyes for cylinder attachments
*Main CEB frame holes
*Arm holes for CEB
*Hopper mount plate holes
*Loader arm cross support plates


==QA Plates==
*Specify QA mechanism
*Do quick attach mechanisms (6 total, 2 per tractor)
*Weld eyes to QA plates
*


==CEB==
*Cut remaining frame pieces
*Cut 3 more hopper sheets
*Prepare hopper edge sealing strips
*
[[Category:Production Runs]]
[[Category:Production Runs]]

Latest revision as of 22:12, 23 October 2012

See blog post - http://blog.opensourceecology.org/2011/06/june-1-production-run-update/

Other documentation forthcoming.


Tasks Remaining

  • Outstanding Parts


Wheel Mounting

  • Drill 1-3/8" ends of shafts
  • Drill 3/4" hole for wheel mounting shafts
  • Cut wheel mounting gussets
  • CNC Torch Table Wheel Mounting plates (12)
  • CNC Torch Hydraulic motor interface plates (12)
  • CNC Torch Hydraulic motor plates (12)

Tractor Balance of Frame

  • Main lower hydraulic attachment plates (6 total)
  • Main upper hydraulic attachment plates (6 total)
  • Prepare valve mounting bar
  • Torch holes for Loader bars
  • Prepare loader bars
  • Loader cross support hole drilling

Holepuncher

  • Eyes for QA plates
  • Eyes for cylinder attachments
  • Main CEB frame holes
  • Arm holes for CEB
  • Hopper mount plate holes
  • Loader arm cross support plates

QA Plates

  • Specify QA mechanism
  • Do quick attach mechanisms (6 total, 2 per tractor)
  • Weld eyes to QA plates

CEB

  • Cut remaining frame pieces
  • Cut 3 more hopper sheets
  • Prepare hopper edge sealing strips