Max Log: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| No edit summary | |||
| (7 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
| =Build Pictures= | =Build Pictures= | ||
| * | *Upload - [https://wiki.opensourceecology.org/index.php?title=Special:Upload&wpDestFile=Upload] | ||
| =Time Log= | =Time Log= | ||
| Write down morning work done, lunch time, and afternoon work done. | Write down morning work done, lunch time, and afternoon work done. | ||
| {{Timelog|Max2}} | {{Timelog|Max2}} | ||
| =Wed Oct 29, 2025= | |||
| Morning: 10:10am-12:15pm | |||
| * Installed PV panels | |||
| [[File:Solar1.jpg|thumb|Solar panels closeup]] | |||
| [[File:Solar2.jpg|thumb|First row of solar panels installed]] | |||
| Lunch: 12:15pm-1:40pm | |||
| Afternoon: 1:40pm-7pm | |||
| * Finished installing PV panels | |||
| [[File:Solar3.jpg|thumb|Solar panel installation nearly complete]] | |||
| [[File:Solar4.jpg|thumb|Solar panel installation complete]] | |||
| * Trimmed roof membrane on east side of building to fit trim boards | |||
| * Started installing trim boards on roof | |||
| =Tue Oct 28, 2025= | |||
| Morning: 10:05am-12:45pm | |||
| * Installed 2nd sliding door handle/lock and adjusted roller (~5min total) | |||
| * Put up R38 fiberglass insulation into the ceiling, covered about 5 rows | |||
| Lunch: 12:45pm-1:45pm | |||
| Afternoon: 1:45pm-5:15pm | |||
| * Sealed cracks & gaps between wall modules & rafters/taper with spray foam | |||
| * Finished ceiling insulation in the first 2 house modules | |||
| [[File:Ceiling insulation.jpeg|thumb|Ceiling insulation]] | |||
| * Started insulating wall modules in house module 1 with R19 fiberglass | |||
| [[File:Wall insulation.jpeg|thumb|Wall insulation]] | |||
| * Started taking off some of the floor level OSB strips to fill in gaps behind them with spray foam (in house module 3) | |||
| =Mon Oct 27, 2025= | =Mon Oct 27, 2025= | ||
| Morning: 10:05am-2:30pm | |||
| * Helped attach roof rafter braces | * Helped attach roof rafter braces | ||
| * Started attaching some PV panels | |||
| Lunch: 2:30pm-3:30pm | |||
| Afternoon: 3:30pm-6:20pm | |||
| * Measured out PV spacing on most runners | * Measured out PV spacing on most runners | ||
| Line 18: | Line 70: | ||
| * Finished installing first row of PV panels | * Finished installing first row of PV panels | ||
| Spent 2h after work learning/trying out FreeCAD 1.0 | |||
| Evening (non-work): | |||
| * Spent 2h after work learning/trying out FreeCAD 1.0 | |||
Latest revision as of 14:30, 30 October 2025
Build Pictures
- Upload - [1]
Time Log
Write down morning work done, lunch time, and afternoon work done.
Wed Oct 29, 2025
Morning: 10:10am-12:15pm
- Installed PV panels
Lunch: 12:15pm-1:40pm
Afternoon: 1:40pm-7pm
- Finished installing PV panels
- Trimmed roof membrane on east side of building to fit trim boards
- Started installing trim boards on roof
Tue Oct 28, 2025
Morning: 10:05am-12:45pm
- Installed 2nd sliding door handle/lock and adjusted roller (~5min total)
- Put up R38 fiberglass insulation into the ceiling, covered about 5 rows
Lunch: 12:45pm-1:45pm
Afternoon: 1:45pm-5:15pm
- Sealed cracks & gaps between wall modules & rafters/taper with spray foam
- Finished ceiling insulation in the first 2 house modules
- Started insulating wall modules in house module 1 with R19 fiberglass
- Started taking off some of the floor level OSB strips to fill in gaps behind them with spray foam (in house module 3)
Mon Oct 27, 2025
Morning: 10:05am-2:30pm
- Helped attach roof rafter braces
- Started attaching some PV panels
Lunch: 2:30pm-3:30pm
Afternoon: 3:30pm-6:20pm
- Measured out PV spacing on most runners
- Attached front PV mounts on most runners
- Finished installing first row of PV panels
Evening (non-work):
- Spent 2h after work learning/trying out FreeCAD 1.0





