Prepare Electrical System Components: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*[6] Cut lugs *Prepare battery to solenoid cable *Prepare solenoid to starter cable *Prepare ground cable *Cut battery cables to length, insert into lugs, and flatten *Drill lug ...")
 
(Marked this Page for Later Work)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:
*Bolt on terminals
*Bolt on terminals


[[Category:Fabrication Procedures]]
[[Category: Electronics]]  [[Category: Fabrication Procedures]] [[Category: Incomplete Pages]]

Latest revision as of 05:41, 18 July 2021

  • [6] Cut lugs
  • Prepare battery to solenoid cable
  • Prepare solenoid to starter cable
  • Prepare ground cable
  • Cut battery cables to length, insert into lugs, and flatten
  • Drill lug holes
  • Select solenoid location, drill frame, and attach solenoid to frame
  • Prepare charging wire, attach charging wire extension to engine
  • Wire up starter switch - kill wire, solenoid wire, power wire
  • Select location for starter switch
  • Install starter switch
  • Prepare and weld on mount for throttle cable
  • Attach throttle cable
  • Build battery box
  • Cut battery hold-down cable
  • Secure battery to battery box
  • Bolt on terminals