=[[12/1/11-12/16/11]]=




=[[11/1/11-11/29/11]]=


=11/29/11=
=[[9/28/11-10/29/11]]=
* [http://youtu.be/4j-qbO1WeCQ/ Bobcat to Lifetrac conversion plate]
* [http://youtu.be/RMtb8BDZL6M/ Pulverizer on conversion quick attach]




 
[[Category:Personal Logs]]
=11/28/11=
*Moving Roof Boxes Onto Roof*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//UU5fn9QHHoI" frameborder="0" allowfullscreen></iframe></html>
*Plans coming together
 
 
*Moving Roof Boxes Panorama*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//STITPQC7wF8" frameborder="0" allowfullscreen></iframe></html>
 
 
*Brick City*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//SFrECttMxEE" frameborder="0" allowfullscreen></iframe></html>
*Tarp removal to allow for bricks in `Brick City` to dry
*Lettin' it all dry out
 
 
*Lifetrac Upgrades*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//hICQOCHkDsk" frameborder="0" allowfullscreen></iframe></html>
 
 
 
*Power Cube Connection to Tractor*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//nNVVfaXQ3W0" frameborder="0" allowfullscreen></iframe></html>
*Connecting power lines from Power cube to valves
*2 return lines
*Check valves to ensure multiple Power Cubes employed don't fight each other
 
 
 
* [http://youtu.be/NRX7e39psag/ Fredrick Emmons Earth Burm biotecture]
* [http://youtu.be/8OZleuMZRRw/ Pushing roof sections onto workshop]
* [http://youtu.be/Gv9WEuerAKw/ Monday morning workshop update]
* [http://youtu.be/5vEK7CQoWV8/ Unloading plywood and framing]
* [http://youtu.be/4vEXUAUv9OQ/ One minute video of 4" brick pressing]
* [http://youtu.be/rEgkIXtFk6k/ Lifetrac dismounting wheels]
* [http://youtu.be/hLVOX7ckz2E/ Another minute of shaker]
* [http://youtu.be/kNU0mq-DbZc/ Bobcat exploded?]
* [http://youtu.be/b2V77e659sU/ Aftermath of Bobcat explosion]
* [http://youtu.be/hA1eBPKkTv8/ Reinforcing CEB compression chamber]
* [http://youtu.be/W-R6ourC2LU/ Reinforcing CEB compression chamber 2]
* [http://youtu.be/WdBGzQUMd4g/ Brick pressing and roller setup]
* [http://youtu.be/b4kTMcnp1tw/ Grate modification]
* [http://youtu.be/PUrnUKQQL9Y/ Brick mudding and laying]
* [http://youtu.be/77uueUvhzU0/ Early days brick laying]
* [http://youtu.be/Dg_K5RlKvFk/ Soil Pulverizer overview]
* [http://youtu.be/mJLojvhpizg/ Replacing solenoid driver board on CEB]
* [http://youtu.be/ATgOE3kt05c/ Moving Soil Pulverizer into shop]
 
 
 
 
=11/26/11=
*Loader Mounted Cement Mixer Results*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//NGFP_MUik9A" frameborder="0" allowfullscreen></iframe></html>
*Modication needed
 
 
*Intro on Cement Mixer*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//XnYVmhIhFv0" frameborder="0" allowfullscreen></iframe></html>
 
 
 
*Perfect Day for Pressing Bricks*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//nD9PlliLqsQ" frameborder="0" allowfullscreen></iframe></html>
*Marcin and Floyd making the best use of bad weather
*Brick pressing under cover
 
 
* [http://youtu.be/_xc_Owf83uo/ Loading soil without pulverizer]
* [http://youtu.be/4G2DiAo3fOA/ Loading hopper straight from loader]
* [http://youtu.be/BsEM3tlatPc/ Shaker Function]
* [http://youtu.be/eYVUaPwwqZ4/ 1 minute of pressing]
* [http://youtu.be/VV2QdjUj17g/ 1 minute of pressing (2)]
* [http://youtu.be/i6M4pxK3qdo/ Cement mixer in action]
* [http://youtu.be/1moX6--taIw/ Mixer lid closed]
* [http://youtu.be/2kmtixaM2_k/ Loading cement mixer]
* [http://youtu.be/CPwmD9jtWtg/ Attaching mixer to Bobcat]
* [http://youtu.be/Q5Eldy2GgNM/ Another miute of pressing]
* [http://youtu.be/EUK0hk1TTaY/ Shaker and Stacking]
* [http://youtu.be/1la87nE_j6c/ Loading soil without pulverizer]
* [http://youtu.be/Xq_YVINGm9o/ Shaker detail]
* [http://youtu.be/MwNaRa-rayw/ Shaking soil down CEB machine]
* [http://youtu.be/5yrc0-UwZMg/ `nother minute of pressing]
* [http://youtu.be/q7t6ouSXRw8/  First use of the workshop for modification of Lifetrac]
* [http://youtu.be/MgnJVVWG2Qc/  James Slade from Texas]
* [http://youtu.be/MgnJVVWG2Qc/  James Slade from Texas]
 
 
 
=11/25/11=
*Floyd Details Workshop Alignment Methods*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//tGGUcKYeX2o" frameborder="0" allowfullscreen></iframe></html>
*Techniques and tools to perfectly align workshop
*Level, chalk line and string line instructional
*Patterns to ensure level alignments
*Use of cripplers for beam and box installation
 
 
*Floyd Talks about Reject Lime Being Used to Press Bricks*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//3zGK9ak7u2I" frameborder="0" allowfullscreen></iframe></html>
*Possible use for reject lime, to make blocks for weather-facing exterior perimeter foundations (cheaper)
 
 
 
*Floyd Describes Column Prototype*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//Azs4HdSz4vw" frameborder="0" allowfullscreen></iframe></html>
*2x2 foot hollow column prototype design to be filled in
 
 
 
*Current Construction Scene*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//amwwNMnRF2k" frameborder="0" allowfullscreen></iframe></html>
 
 
 
* [http://youtu.be/LDpMoWSP1_o/ Putting roof sections on the workshop]
* [http://youtu.be/Hoq8qHA0jaw/ Roof sections lean on roof]
* [http://youtu.be/0iNfMP_UUkg/ John the Carpenter discusses progress and forecasts roof rafters up next week (weather providing)]
* [http://youtu.be/SBWqL9GZzhg/ From pulverizer to brick]
* [http://youtu.be/Sv5u0uRKJes/ Pulverizer munching soil]
* [http://youtu.be/B_33-2wbubI/ From pulverizer to brick line]
* [http://youtu.be/dovUkRg3XIs/ 1600 Bricks pressed (4.5 bricks per minute consistently)]
 
 
 
 
=11/24/11=
*Testing Report for Field Pulverizer*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//BcnsV_a-Nx0" frameborder="0" allowfullscreen></iframe></html>
*Modifications and issues from Field Pulverizer tests
*Safety recommendations from Marcin for safe Field Pulverizer use
 
* [http://youtu.be/rHHYDZ1OALg/ Workshop roof preparation construction]
* [http://youtu.be/gw91-IExCn4/ Temporary post use]
* [http://youtu.be/29crGlUM4YA/ Simultaneous action of CEB Presses]
* [http://youtu.be/KyIldsuzp7g/ Getting cement mixer up and running]
* [http://youtu.be/s3bVxYNM1Co/ Brick City, repository or bricks for storage from elements]
* [http://youtu.be/o83wkO9ep6w/ Windrows of dug-up soil for brick pressing of 2,000-3,000 bricks]
* [http://youtu.be/2GwBRRFvptw/ Reject limestone soil use]
* [http://youtu.be/gTSuoFJ5dCs/ Leveling workshop frame questions]
* [http://youtu.be/ydI7FxrkN4M/ Workshop skeleton panorama]
* [http://youtu.be/_f-Ou_sHCoQ/ Strawbales and shop]
 
 
 
=11/23/11=
*Roof Anchoring with Floyd*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//5iMBFjGXPf8" frameborder="0" allowfullscreen></iframe></html>
*Floyd discusses anchoring the structures for the upcoming roof build
 
 
 
=11/22/11=
*Floyd Discussing Structural Stability*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//WEFT8SlYhRA" frameborder="0" allowfullscreen></iframe></html>
*Floyd discusses bracing, support triangles and tying in preparation for Roof Boxes
 
 
* [http://youtu.be/xZubqUuM9Xw/ Next steps to the roof with 30-year carpenter industry veteran John]
* [http://youtu.be/I98uh3hSjWQ/ Construction scene review]
 
 
 
*Workshop Status with Floyd Hagerman*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//m6tyXguzWKs" frameborder="0" allowfullscreen></iframe></html>
*Floyd discusses interim progress on workshop build and upcoming element builds
 
 
 
=11/16/11=
*CEB Construction Review and Problem Solving*
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//T9KWd42saQg" frameborder="0" allowfullscreen></iframe></html>
*Experienced builder Floyd Hagerman brings 20-years of experience to CEB project
*Addresses structural and moisture issues of troublesome wall on build
*Floyd discusses important details about weatherizing exposed walls and fixes for existing issues
 
 
* [http://youtu.be/NY3Calnx1_4/ CEB Press fitting crack]
 
 
=11/14/11=
* [http://youtu.be/-IZbfHQSPCs/ Prepping for columns build]
* [http://youtu.be/9GqI_ZxHlPw/ Reinforcing main compression chamber]
 
 
 
 
=11/13/11=
* [http://youtu.be/egs-694TKJo/ Moving lumber for roof boxes]
* [http://youtu.be/DA7RfwVl7Fc/ Moving lumber for roofs]
* [http://youtu.be/-IZbfHQSPCs/ Preparing to build columns]
* [http://youtu.be/9GqI_ZxHlPw/ Reinforcing main compression chamber]
 
 
 
=11/13/11=
*Yoonseo Gives Tutorial on Laying Bricks for the Columns
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//69x5sj-ZA9g" frameborder="0" allowfullscreen></iframe></html>
*Yoonseo explains the proper use of slurry, brick laying techniques and proper patterns
*Finishes with a Q&A where Yoonseo fields questions as to why brick patterns and proper technique are necessary
 
 
 
=11/12/11=
*Problem with Nov 12 Pressing
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//fOOeourIcvk" frameborder="0" allowfullscreen></iframe></html>
*Rain without sun left the soil wet, putting a damper on the scheduled pressing
 
 
*Bridging Issue
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//8EchEIGiFt4" frameborder="0" allowfullscreen></iframe></html>
*Wet soil causing problems with bridging
*The painfully slow, yet effective, 'poking-it-with-a-stick' methodology keeps project on track but behind schedule
 
 
 
* [http://youtu.be/IJfO5lxxw5Q/ Meeting of the CEB presses]
* [http://youtu.be/5wpn9a4j55E/ Powell machine arrives to the site]
* [http://youtu.be/OF7YVy-Qwlk/ Powell CEB Press creating different sized blocks]
* [http://youtu.be/qOY_Xo2tmdg/ Moving Powell machine while on site]
* [http://youtu.be/NFy--yXpCLE/ Visual of pressing machine at work]
* [http://youtu.be/NDGY5BfXW0w/ Bricks finished being loaded onto pallets]
* [http://youtu.be/ut4-i1ckODQ/ Forklift moving pallets of pressed bricks]
 
=11/11/11=
*Prototype 1 Loader Mounted Cement
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//lKCTLTGP7nw" frameborder="0" allowfullscreen></iframe></html>
*Visual of Prototype 1 and its quick attach motor, Lifetrac standard, large internal paddles
* [https://www.youtube.com/embed//0V2Au1gTpqo/ Additional visual]
 
 
 
=11/05/11=
*Workshop Columns Assembly
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//SpnnjVi5oiY" frameborder="0" allowfullscreen></iframe></html>
*Column construction coming along nicely
 
 
 
*Words of Wisdom from Yoonseo
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//Z3BNZqqnZqo" frameborder="0" allowfullscreen></iframe></html>
*A wonderfully eloquent soliloquy about what brought Yoonseo to the Factory Farm project
 
 
=11/04/11=
*Workshop Slab
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//6l2wj3JLgME" frameborder="0" allowfullscreen></iframe></html>
*2/3 of the slab is finished
*Description of the final details and pour to complete the concrete slab
* [http://youtu.be/YzCLLUKfcS0/ concrete slab joints cutting visual]
* [http://youtu.be/iTR0VRkYEIc/ Release cut ergonomics]
 
 
 
=10/29/11=
*Saturday the 29th--Update
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//Ccxy64s-fbY" frameborder="0" allowfullscreen></iframe></html>
*Short update--continuing pressing
 
 
 
 
*CEB Micro-controller Repair
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//Bpv708wMK3I" frameborder="0" allowfullscreen></iframe></iframe></html>
*Micro-controller repair of accidentally-broken solenoid on the CEB press
* [http://youtu.be/GPndXtIpmaA/ Solenoid repair]
 
 
 
=10/27/11=
*CEB Workflow
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//UW6-CET8GQg" frameborder="0" allowfullscreen></iframe></html>
*Short update on the brick laying process
 
 
 
*Pressing Grates
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//DG90LJvDA7I" frameborder="0" allowfullscreen></iframe></html>
*Short update on the work site
*realization that a grate modification is needed
 
 
 
=10/24/11=
*Brick Pressing in Production
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//sGarCTDiEcw" frameborder="0" allowfullscreen></iframe></html>
 
 
 
*Shims
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//bahhYtxy4Zg" frameborder="0" allowfullscreen></iframe></html>
*Brianna documents the importance of using 'shims' while welding
 
 
 
*Remote Technical Documentation
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//X-QJXrqL8h8" frameborder="0" allowfullscreen></iframe></html>
*Video documentation from Rebecca regarding her and Brianna's build
*Brianna working on written documentation
*Help with CAD documentation needed for clarification with computer modeling
 
 
 
*Power Cube Power and Return
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//aokPNqd8YJI" frameborder="0" allowfullscreen></iframe></html>
*Power lines from Power Cubes explanation
 
 
 
*Case Drain Returns on Tractor
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//9ggPiMzIDO4" frameborder="0" allowfullscreen></iframe></html>
*Case drain return, a low fluid line connecting the 4 motors
 
 
 
*Pressure Relief Instructional
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//1dlLtHt-Pd4" frameborder="0" allowfullscreen></iframe></html>
*Rebecca and Marcin show how to properly set the pressure relief PSI settings
 
 
 
*Properly Installed Drawers
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//cIkqryssZ7o" frameborder="0" allowfullscreen></iframe></html>
*Brianna shows what the finished project should look like
*Tips on how to fix any misalignment mistakes
 
 
 
*How-To Install Drawers
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//xzoen7x46qI" frameborder="0" allowfullscreen></iframe></html>
*Brianna's step-by-step how-to on the drawer installation
*Tips on mounting to the rollers correctly, a rather tricky process
 
 
*Progress on CEB Press
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//YLZKFp9o23g" frameborder="0" allowfullscreen></iframe></html>
 
 
 
* Bobcat to Lifetrac Conversion Video Instructions
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//s1SR7zCtbxQ" frameborder="0" allowfullscreen></iframe></html>
* [http://youtu.be/w3N140FDoas/ Step 2]
* [http://youtu.be/q7jX78Kv240/ Step 3]
* [http://youtu.be/HCiW9BDr_rY/ Step 4]
* [http://youtu.be/x2r6Y--Pw_g/ Step 5]
* [http://youtu.be/O_576r--oEo/ Step 6]
* [http://youtu.be/Xx_IoEcpAXY/ Step 7]
* [http://youtu.be/x7M7NxJDvfg/ Step 8]
* [http://youtu.be/SXadyj7HVI8/ Step 8.5]
* [http://youtu.be/tbhqfMHaAxc/ Step 9]
* [http://youtu.be/yHuiL5eZHs8/ Step 10]
 
 
 
=10/20/11=
*Oct 20, 2011 UPDATE*
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//4XyvuB367rE" frameborder="0" allowfullscreen></iframe></html>
*Have rollers for earth brick press
*Rented a Bobcat for 1 month--will attach a conversion plate between Lifetrac and Bobcat to run sol pulzeriver, Power Cube and CEB Press
*Need solution for couplers snapping under pressure
 
 
 
''' Bobcat meets Conversion Plate meets Pulverizer
'''
* Soil Pulverizer on Bobcat
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//Hd7qwOxxuzI" frameborder="0" allowfullscreen></iframe></html>
 
* [http://youtu.be/Zx-pZm0btKc/ Pulverizer mounts on Bobcat]
 
 
* Bobcat meets Pulverizer
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//eSm4fifkT0M" frameborder="0" allowfullscreen></iframe></html>
 
* [http://youtu.be/FBjquZyQUHs/ Bobcat to Lifetrac conversion plate]
* [http://youtu.be/dBQn3DJUaT0/ Recovery plan on CEB construction]
* [http://youtu.be/09_tRox7wEs/ Placing CEB press in position]
 
 
 
 
=10/18/11=
* Oct 18th Update
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//mpJ2RvpCx_Y" frameborder="0" allowfullscreen></iframe></html>
 
* Update for True Fan supporters
* 6K for Kickstarter campaign with 30 days to go
* Main focus currently is mounting the pulverizer onto the tractor--plan B should the 3 tractors not hold up is to rent bobcats and create conversion plate
* New equipment protocols coming online, including cement  mixer and sawmill
 
 
 
=10/17/11=
* Shuttleworth Fellowship Brief
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//h8-YA5KqsE4" frameborder="0" allowfullscreen></iframe></html>
 
* Marcin describes the ideology, current and on-going projects of GVCS and the future goals and plans for the Shuttelworth Fellowship committee.
 
 
 
=10/15/11=
* Power Cube Tabs Connecting to Tractor
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//0FaBXwgp5dw" frameborder="0" allowfullscreen></iframe></html>
 
* Tab-mounting instructions for mounting Power Cube to the frame of Lifeterac
 
 
 
* Lifeterac Motor Coupler Failure
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//i4GjoFQ3zsg" frameborder="0" allowfullscreen></iframe></html>
 
* Keywheel on Lifeterac snaps coupler
* Remedy to have new couplers made by shop on Monday
* Instructions on how to remove difficult wheelshafts and coupler
* [https://www.youtube.com/embed//jPnKrAnEW88/ Welding Lifeterac Mufflers]
* [https://www.youtube.com/embed//3dldfw36B-I/ Welding Remaining Mufflers]
 
 
 
* Power Cube Wiring 2
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//KscQM0MevXE" frameborder="0" allowfullscreen></iframe></html>
 
* Instructions on connecting wiring
 
 
 
* Oct 15 Update
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//hmXBRe_zhXQ" frameborder="0" allowfullscreen></iframe></html>
 
* Tractor issues: snapped couplers on wheel motors by forgetting to adjust pressure on main hydraulic line
* Reducing from 3,000 PSI to half that, for safety
 
 
 
* Pouring Concrete Foundations
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//JC2s6F3v8yE" frameborder="0" allowfullscreen></iframe></html>
 
* A panorama view of the concrete pouring
 
 
 
=10/14/11=
* Moving Rebar to HabLab Site
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//nNQ20gRrHns" frameborder="0" allowfullscreen></iframe></html>
 
* Using OSE Tractor to move rebar to site
 
 
 
* Foundation Pouring Series
* Ready to pour HabLab foundations
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//Hg9RVcB-lKk" frameborder="0" allowfullscreen></iframe></html>
* Foundations for HabLab ready to pour
* Overview of final foundation constructions
* [https://www.youtube.com/embed//P9bm50ghdHc/ Floating]
* [https://www.youtube.com/embed//CHdol5WWtuk/ Pour Sock]--first slab flattened, pouring second
* [https://www.youtube.com/embed//xULhiNT9qzU/ Beginning to Pour]--pouring concrete for first slab
* [https://www.youtube.com/embed//frp9SLWQIlw/ Little Dry Quick Fix]--"Little dry so were adding 5 gallons of water"
* [https://www.youtube.com/embed//YcwCEz3tu14/ 8 Cubic Yards]--pour of 8 cubic yards, 7.5 for slab
* [https://www.youtube.com/embed//uwem0DyHcqc/ Cool panorama shot of the Pour]
 
 
 
 
=10/14/11=
 
*HabLab rebar and embodied energy
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//usnjQIsWLgI" frameborder="0" allowfullscreen></iframe></html>
 
 
* 10-man team pulls all-nighter to finish outside forms (average 6 people for 18 hours = 108 manhours)
* view of completed layout with forms
* retaining wall and forms completed and rebar layed
* ready to pour concrete
 
 
 
=10/13/11=
* Preparing the for [[HabLab]] Wall Foundations.
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//5P5JemNBdTg" frameborder="0" allowfullscreen></iframe></html>
 
 
=10/10/11=
* We are finally kicking off our Kickstarter to go The Last Mile on the construction part of the Global Village Construction Set:
** http://www.kickstarter.com/projects/622508883/global-village-construction-set
 
* Construction Planning Meeting
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//VsHbNEVeudg" frameborder="0" allowfullscreen></iframe></html> <html><iframe width="300" height="203" src="https://www.youtube.com/embed//6CNMuBXIaAA" frameborder="0" allowfullscreen></iframe></html>
 
 
=10/09/11=
* [http://blog.opensourceecology.org/2011/10/dear-true-fans-october-9-update/ Dear True Fans: October 9 Update]
<html><iframe src="https://player.vimeo.com/video/30301005?title=0&amp;byline=0&amp;portrait=0" width="400" height="225" frameborder="0" webkitAllowFullScreen allowFullScreen></iframe></html>
 
 
=10/07/11=
 
* Soil Pulverizer Prototype 3
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//uK_pra4YORc" frameborder="0" allowfullscreen></iframe></html>
 
 
* Cost: 1215 in labor, 25h at 50 dollars/h + 750 in materials.
* Pulverizes and loads the soil in 1 step!
* This device replaces a stationary pulverizer plus a conveyor (both about 20000 dollars).
 
 
* [[Ted Mosher]] arrived today:
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//0ABIIAxpbcw" frameborder="0" allowfullscreen></iframe></html>
 
 
 
* [http://www.youtube.com/user/marcinose#p/u/15/vEbowMaDAuY CEB Controller Wiring explanation] - check the 6 parts.
* [http://www.youtube.com/watch?v=-UYuw-Dei2Q Hydraulic Hack]
* [http://www.youtube.com/user/marcinose#p/u/7/1aXzcXhghnU 4 CEB Presses, finishing] - 2-3 of them for construction.
 
* Documentation evolving
** Upload immediately to youtube from an iPhone
** People can access it and make instructionals, [[Ian Midgley]] will share how to do it.
** The more material we have, the more material people can choose.
** We write down the procedure in the Wiki
** [[Howard Agnew]] writes the actual scripts remotely.
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//H-Ss3_uCsHw" frameborder="0" allowfullscreen></iframe></html>
 
 
* OSE HabLab - 8 minutes to build a platform, [http://www.youtube.com/watch?v=cTdgHadNoHM Beginning to stack bales on platform]
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//bLQZGGkvSdQ" frameborder="0" allowfullscreen></iframe></html>
 
 
* [http://www.youtube.com/watch?v=72JyOqY7G8I Temporary strawbale structure], [http://www.youtube.com/watch?v=1RKE6GfPobA stacking strawbales]
** See [[Temporary Hay House]], 1h to build.
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//HiFGgS33vDk" frameborder="0" allowfullscreen></iframe></html>
 
 
* [http://www.youtube.com/watch?v=qaa3-NI-F58 Bailing results], [http://www.youtube.com/watch?v=jVQK_uc0bag On trailer to pick up bales], [http://www.youtube.com/watch?v=dZxhtV8Pz8c Picking up bales]
 
=10/05/11=
 
* [http://www.youtube.com/watch?v=C0kosot_EMo Ergonomic analysis of excavation] - 500 sqm with foundation pads
** For excavation 4000 dollars for 4 days of labor.
*** Day 1 - 4h bulldozing with CAT D7, 4h trackhoe.
*** Day 2 - 9,5h excavator (all 10 hours of labor), 3h skid loader
*** Day 3 - 11h excavator, 3h bulldozing, 6h skid steering with Bobcat
*** Day 4 - 1h excavator, 3h skid steer
*** Fuel: bulldozing 10gal/hour, excavator 4gal/hour, Bobcat 3gal/h
 
* [http://www.youtube.com/watch?v=C_XzT1yaIWs Baling and House construction ergonomics]
** Baling ergonomics: 3h for 100-200 bales. Issues with the length of bales.
** House construction ergonomics - 3h to pour 40 pads, 7 cubic yards of concrete, 6 people working. 6x3 = 18 human hours.
** Ergonomics of preparing the forms - 0.5h per pad, 40 pads = 20 hours. Leveling them off. So about 1h for each pad = 40h for all pads. Work: lay the form out, do the rebar, put the rebar in, dig out a little bit, put some gravel and [http://www.youtube.com/watch?v=H652WEcRsDY leveling].
 
* [http://www.youtube.com/watch?v=c3CclAb_ync Cement truck arrives] and pours cement in the Foundation pads.
** Side comment: For the foundation pad construction: 20 minutes per pad, to put it in form and put in the metal. With 1-2 people.
* [http://www.youtube.com/watch?v=-_LG5mJ-Z8E Muffler design]
** Parts: steel pipe and insert with about 40 holes, 7 inches long, 6 inches on the inside, 1 inch from the base. With modular pipe fittings.
 
* [http://www.youtube.com/watch?v=-G1u7qDQvUw Getting ready to bale ], [http://www.youtube.com/watch?v=jDgyp99So_Y Baler adjustment], [http://www.youtube.com/user/marcinose#p/u/51/aGSAbszJIfc Engaging the baler]
** We are not using LifeTrac because all of the wheel control valves are broken. Will get new one, but a new delay.
** Good news: Saw mill blade ordered, 1000 dollars.
** We need a Farmer!
** Baler Discussion
*** Big wheel and a fly wheel - we can replace it by hydraulics.
*** Auger, the pick up mechanism, and String tie mechanism.
** [http://www.youtube.com/user/marcinose#p/u/49/B6Ik81o_Y2s Straw quality assessment] - dry, crispy,
** [http://www.youtube.com/user/marcinose#p/u/48/V50L9ZFkYX4 First bale!], [http://www.youtube.com/user/marcinose#p/u/47/fnmD1zLIyOk Baling shakedown in progress]
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//V50L9ZFkYX4" frameborder="0" allowfullscreen></iframe></html> <html><iframe width="300" height="203" src="https://www.youtube.com/embed//GVJeMyw6Qf4" frameborder="0" allowfullscreen></iframe></html>
 
 
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//-2Jo1aU3pYw" frameborder="0" allowfullscreen></iframe></html>
 
 
* Baling day 1 summary
** 3 bales/minute, 180/hour, about 1500/day. 1 bale is sold for 3 dollars = about 5000 dollars per day.
 
=10/03/11=
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//A2h_qzPBJJw" frameborder="0" allowfullscreen></iframe></html>
 
 
* OSE Certification
** Power Cube Producer - [http://blog.opensourceecology.org/2011/10/starting-project-visit/ Tom Griffin] from Texas, 1st replication, aiming for OSE Certification.
*** OSE provides Marketing assistance, publicize in our networks
*** He is contributing back to the community.
** OSE License relates to the [[OSE Specifications]], features the OSE products embody.
** Certified people will comment and describe how their product meets each point of the OSE Specification. It will be transparent for the user if he gets a product from somebody else or us, so he know exactly what he is getting, particularly on a life-time design and modularity aspects of our equipment. The world benefits by knowing what they are getting into, and the certified producer benefits by the having access to our marketing channels.
** OSE License is for building a distributing economics. It is not for us building an empire, but for us distributing as much productive power to everybody out there as possible.
*** To support the open sourcing of civilization, the producers would contribute a reasonable amount back to the OSE project, like 3%, we will have to decide on that, we don't want to overtax them, but a little kickback to the project to continue further open source development.
*** We will custom design these agreements, it will on a case by case basis.
** With this OSE distributive economics license we focus on the fact that whoever is a producer is documenting the work completely, meaning the bills of materials and designs and they will pass our mark only when they are truly bringing about distributive economics for the whole world to benefit with. And that's a beautiful package that nobody can disagree with, that can get a lot of public support on many fronts.
** That's about the OSE License, we will keep developing it, as people get on line to produce it we hope to have people actually funding the project through donations back to the commons in terms of developing further open source goods.
 
 
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//YJtgMbP5W30" frameborder="0" allowfullscreen></iframe></html>
 
 
* Message to Jason Fields from the [http://theurbanfarmingguys.com/ Urban Farming Guys]
** Ian produced [http://blog.opensourceecology.org/2011/09/lifetrac-frame-construction-video/ 7 minutes video] for the entire procedure to build the frame of the LifeTrac.
** Start writing the script and preparing your Kickstarter materials asap.
** Create a simple jig and I am hoping that even you guys will complete the whole tractor frame within hours.
 
 
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//rpY-DyUPYAA" frameborder="0" allowfullscreen></iframe></html>
 
 
* Dear True Fans and Supporters - Update
** about 42 days of construction. Foundation will be poured tomorrow. Excavation is done. Right now we are doing haying for the hay bales.
** Next week we will be full-time producing and laying CEB Bricks. SHonda is getting the CEB up. We go now to Sweiger to work on the Sawmill, hay cutter and pulverizers.
** Kauffman Foundation may would have 103,000 dollars for us, but I would like to see this money across the table, there are a lot of technical difficulties there.
** If we can show the straw bales and cut lumber from our own tree, that would be beautiful. We are finishing the Sawmill, we didn't get the blade till tonight, we will try to secure that.
** By the end of this week we aim to have 3 Tractors with 6 Power Cubes so we can start construction.
** [[Yoonseo Kang]] is coming this Thursday. And [[Ted Mosher]] anytime this week.
** Revenue streams from non-profit, real production, investors, loans.
 
 
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//rJ7J1wO1Do4" frameborder="0" allowfullscreen></iframe></html>
 
 
* Lifetrac Tracks design and jig comments - 3 links in-between, quality control - make sure the links are touching against the rebar.
* [http://www.youtube.com/watch?v=T-lP6aysYw8 Filling Tractor 2 with hydraulic fluid]
 
=10/02/11=
* Hay conditioner 101 - International 1086 Tractor - about 130HP, Hesston hay conditioner (a rotary cutter), 1 steel and 1 rubber roll. [http://www.youtube.com/watch?v=bTFJ0Y5KIQI In Action].
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//BWC8KZsgWck" frameborder="0" allowfullscreen></iframe></html>
 
 
* 1500 bales to be pressed - [http://www.youtube.com/watch?v=7YFhjf5U-V8 Meet the hay conditioner]
* [http://www.youtube.com/watch?v=E7g7LiYENyQ Beginning to clear vegetation], [http://www.youtube.com/watch?v=cMO7Qqc7GBc Starting the dozing]
* [http://www.youtube.com/watch?v=IGGlL8KWOFg Secondary cylinder mounting]
* Brianna explains [http://www.youtube.com/watch?v=HnFXzrwzsjg 1) Squaring CEB Drawer], [http://www.youtube.com/watch?v=OXSYWPXF8DY 2) Frame Jig], [http://www.youtube.com/watch?v=F9QAa7oHbiE 3) Fitting Cylinder], [http://www.youtube.com/watch?v=ZEhTowqOwlw 4) Frame and Roller Guide Holes], [http://www.youtube.com/watch?v=cwuQaTd2QZw 5) Frame Jig Turning], [http://www.youtube.com/watch?v=4H_mV4GB_iM 6) Frame Welding], [http://www.youtube.com/watch?v=7HDCZZSS7ww 7) Making Bolts], [http://www.youtube.com/watch?v=g56-gpn_q4Y 8) Shims Squaring Drawer], [http://www.youtube.com/watch?v=_pICqVpcZ8E 9) Squaring Hyd Cylinder], [http://www.youtube.com/watch?v=ZpZ0OUmGFIA 10) Squaring Hyd Cylinder], [http://www.youtube.com/watch?v=agDLLhOxaM8 11) Torching Sensor Holes].
* [http://www.youtube.com/watch?v=vcdISgZ1I4I Loading the Soil Pulverizer]
 
=10/01/11=
* [http://www.youtube.com/watch?v=KdEZJgpJYFQ Nearly finished grading]
* [http://www.youtube.com/watch?v=aZNXzggxjHo Clearing off vegetation]
 
=9/30/11=
* Column foundation forms - a laser level would be useful that sense out an array of lines across the whole field so that we don't have to mess with the water level.
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//RXLGxzXTfCs" frameborder="0" allowfullscreen></iframe></html>
 
 
* Hammering Foundation pads - http://www.youtube.com/watch?v=pfcSDbkpJEw
 
=9/28/11=
 
{| class="wikitable sortable" border="1"
|+ HabLab
|-
| Excavation started<br/> <html><iframe width="300" height="203" src="https://www.youtube.com/embed//J7VzO8MJODQ" frameborder="0" allowfullscreen></iframe></html> || Gravel trucks and spreading<br/> <html><iframe width="300" height="203" src="https://www.youtube.com/embed//5nQo7-ORQPo" frameborder="0" allowfullscreen></iframe> <iframe width="300" height="203" src="https://www.youtube.com/embed//uK3gUh89VhI" frameborder="0" allowfullscreen></iframe></html>
|-
| Excavation <br/> <html><iframe width="300" height="203" src="https://www.youtube.com/embed//vymwnvT-JBA" frameborder="0" allowfullscreen></iframe></html>  || Bulldozing<br/> <html><iframe width="300" height="203" src="https://www.youtube.com/embed//XLU3ctka5c8" frameborder="0" allowfullscreen></iframe> <iframe width="300" height="203" src="https://www.youtube.com/embed//2g2QSMYvniE" frameborder="0" allowfullscreen></iframe> </html>
|-
|}
 
 
* $60k construction grant is in
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//tGV4-EQcXqY" frameborder="0" allowfullscreen></iframe></html>
 
* CEB vault prototype [http://www.youtube.com/watch?v=ngs-WeJMhic 1] and [http://www.youtube.com/watch?v=Zv3YaoHf9r0 2]
* [http://www.youtube.com/watch?v=ucgUYWc2F3U Cat D7 bulldozer fuel consumption] - 10 gal/hr, 90 gal fuel tank
* [http://www.youtube.com/watch?v=OGWqhubZGzg Monday midnight oil update] - shipping 2 Power Cubes, Bulldozer came.
 