The Spark Build: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 16: Line 16:
*Bolting feasibility everywhere
*Bolting feasibility everywhere
*Build order correct for each moduleo
*Build order correct for each moduleo
*Bottom cylinder mounting spacer means can't bolt the tubes together as is
*Bottom cylinder mounting spacer means can't bolt the tubes together as is. Solution: move mounting 4" forward and wheel 4" forward
*1/2" stickout on wheel me


=Parts=  
=Parts=  

Revision as of 20:16, 11 July 2013

Quality Control

LifeTrac4 (v5) snip2.PNG

  • Download File:Cab and Loader Arms 12pm Jul 11.skp
  • Loader forearm stability
  • Force on arm lift cylinder mounting
    • 9 degree cylinder angle means 9400 lbs lift force
  • Foot pedal detail
  • Valve 1 mounting plate detail
  • Valve 2 mounting plate detail
  • Foot pedal detail
    • Pin tight with lever
  • Seat mounting
  • Wheel shaft procedure
  • Loader down pressure
  • Bolts clearing everywhere
  • Bolting feasibility everywhere
  • Build order correct for each moduleo
  • Bottom cylinder mounting spacer means can't bolt the tubes together as is. Solution: move mounting 4" forward and wheel 4" forward
  • 1/2" stickout on wheel me

Parts

First Choice

  • 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
  • 25 GPM Joystick valve - [3]
  • [4] hoses - [4]
  • [2] hoses - [5]

Other Options

  • 25 GPM Joystick valve - [6]
  • 45 GPM auxiliary motor valve - [7] - note: motor auxiliary goes before the joystick loader valve.
    • Fittings - SAE 16 in,out,work - need 3 of [8] and 1 of [9]
  • 25 GPM auxiliary motor valve - [10]