The Spark Build: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
= | =Task Allocation= | ||
*List people and allocate tasks | *List people and allocate tasks | ||
Tasks: | Tasks: |
Revision as of 15:29, 12 July 2013
Task Allocation
- List people and allocate tasks
Tasks:
- Take off wheels
- Cutting materials
- Take off tracks
- Remove power cube
- Get blocks and stand tractor on blocks
Quality Control
- Download File:Cab and Loader Arms 12pm Jul 11.skp
- Loader forearm stability
- Force on arm lift cylinder mounting
- 9 degree cylinder angle means 9400 lbs lift force
- Foot pedal detail
- Valve 1 mounting plate detail
- Valve 2 mounting plate detail
- Foot pedal detail
- Pin tight with lever
- Seat mounting
- Wheel shaft procedure
- Loader down pressure
- Bolts clearing everywhere
- Bolting feasibility everywhere
- Build order correct for each moduleo
- Bottom cylinder mounting spacer means can't bolt the tubes together as is. Solution: bore out holes or move mounting 4" forward and wheel 4" forward and use a x8" plate for mounting
- 1/2" stickout on wheel me
- Narrower cab by 8" on each side to 32 inch door and 40" wide cab, to save 13' of tubing ($170)
Parts
First Choice
- 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
- 25 GPM Joystick valve - [3]
- [4] hoses - [4]
- [2] hoses - [5]