Design for Fabrication Review: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
#Fabrication team modification - assign someone else to fabricate
#Fabrication team modification - assign someone else to fabricate
#[[Fabricability Checklist]]
#[[Fabricability Checklist]]
#Review of materials sourcing
#Review of materials sourcing - could cheaper, closer, better, or other materials be substituted
#Review of design after fabrication is considered

Revision as of 03:15, 9 August 2013

This is a review of both the fabrication strategy and other elements:

  1. Design for Tolerancing Review
  2. Tool choice - is the proposed tool choice effective, or could other tools speed up fabrication?
  3. Location of fabrication
  4. Fabrication team modification - assign someone else to fabricate
  5. Fabricability Checklist
  6. Review of materials sourcing - could cheaper, closer, better, or other materials be substituted