2014 Infrastructure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 9: Line 9:
:#Accommodate porch/patio for HabLab
:#Accommodate porch/patio for HabLab
'''2. Foundation Plan for Electronics Workshop'''
'''2. Foundation Plan for Electronics Workshop'''
#:Including access
:#Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse
#:Leanto heavy equipment storage in back
:#Footprint is 48x48' for the main building (9 bays of 16'x16')
#:Footprint is 48x48' for the main building
:#Leanto on North Side - heavy equipment storage - 3 bays of 16'x16'
#:Foot
:#Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage


=General Plan=
=General Plan=

Revision as of 13:15, 10 March 2014

Requirements and Priorities

Landscape Architecture Needs and Requirements

1. Access Road to HabLab

  1. Includes drainage tubes, 2 - 12' long
  2. Parking lot before 2nd creek
  3. Ability to turn around in front of HabLab
  4. Accommodate porch/patio for HabLab

2. Foundation Plan for Electronics Workshop

  1. Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse
  2. Footprint is 48x48' for the main building (9 bays of 16'x16')
  3. Leanto on North Side - heavy equipment storage - 3 bays of 16'x16'
  4. Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage

General Plan

edit

Hablab

edit

Spring Break Plan

edit

Links