2014 Infrastructure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 58: Line 58:
=Links=
=Links=
*[[Infrastructure Schedule]]
*[[Infrastructure Schedule]]
*[[List of Improvements for Current Buildings]]
*[[Sedum Panels]]
*[[Sedum Panels]]
*[[Alternative Spring Break 2014]]
*[[Alternative Spring Break 2014]]
*[[Architecture Wishlist and Requirements]]
*[[Architecture Wishlist and Requirements]]

Revision as of 12:41, 14 March 2014

Requirements and Priorities

Landscape Architecture Needs and Requirements

1. Access Road to HabLab

  1. Includes drainage tubes, 2 - 12' long
  2. Parking lot before 2nd creek
  3. Ability to turn around in front of HabLab
  4. Accommodate porch/patio for HabLab

2. Foundation Plan for Electronics Workshop

  1. Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse
  2. Footprint is 48x48' for the main building (9 bays of 16'x16')
  3. Leanto on North Side - heavy equipment storage - 3 bays of 16'x16'
  4. Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage

3. Swimming Pool - grading + landscaping

  1. Design of pool, deck, chair area, landscaping around it
  2. Water and electric connections

4. Summer Camp Area

  1. Select location, design floor plan + structure
  2. Design a post-and-beam platform
  3. Water + electrical connection

5. Microhouse Additions

  1. Grade for modules 2-6, otherwise, use LifeTrac for 2-3

Summer Camp

edit

Files

Summer camp scene 1.JPG

Summer camp scene 3.JPG

Summer camp scene 5.JPG

Summer camp scene 7.JPG

Summer camp scene 9.JPG

File:Summer camp gathering space 2014.skp

File:Summer camp gathering space2013.skp

File:Summer camp gathering space version 8.skp

General Plan

edit

Hablab

edit

Spring Break Plan

edit

Links