2014 Infrastructure: Difference between revisions
Jump to navigation
Jump to search
(→Links) |
|||
Line 59: | Line 59: | ||
*FeF [[Infrastructure Schedule]] for Interns | *FeF [[Infrastructure Schedule]] for Interns | ||
*[[FeF Infrastructure Improvements]] | *[[FeF Infrastructure Improvements]] | ||
*[[Shopping List]] | *[[Infrastructure Shopping List]] | ||
=Dev Links= | =Dev Links= |
Revision as of 17:52, 14 March 2014
Requirements and Priorities
Landscape Architecture Needs and Requirements
1. Access Road to HabLab
- Includes drainage tubes, 2 - 12' long
- Parking lot before 2nd creek
- Ability to turn around in front of HabLab
- Accommodate porch/patio for HabLab
2. Foundation Plan for Electronics Workshop
- Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse
- Footprint is 48x48' for the main building (9 bays of 16'x16')
- Leanto on North Side - heavy equipment storage - 3 bays of 16'x16'
- Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage
3. Swimming Pool - grading + landscaping
- Design of pool, deck, chair area, landscaping around it
- Water and electric connections
4. Summer Camp Area
- Select location, design floor plan + structure
- Design a post-and-beam platform
- Water + electrical connection
5. Microhouse Additions
- Grade for modules 2-6, otherwise, use LifeTrac for 2-3
Summer Camp
Files
File:Summer camp gathering space 2014.skp
File:Summer camp gathering space2013.skp
File:Summer camp gathering space version 8.skp
General Plan
Hablab
Spring Break Plan
Work Links
- FeF Infrastructure Schedule for Interns
- FeF Infrastructure Improvements
- Infrastructure Shopping List