2014 Infrastructure: Difference between revisions
Jump to navigation
Jump to search
(→HabLab) |
|||
Line 81: | Line 81: | ||
=Work Links= | =Work Links= | ||
*Prep for April Workshops - [https://docs.google.com/a/opensourceecology.org/document/d/1cnHBN6j4VoCLoayBWO8vTI_S3PQAHa3UyMlGebZtO1E/edit] | |||
*MH Addition requirements - [https://docs.google.com/a/opensourceecology.org/document/d/199eSBGlAVZpeICAyxhrwKUvEk83Gqo31pMXF4_YxLv0/edit#heading=h.9f0xjban85oc] | *MH Addition requirements - [https://docs.google.com/a/opensourceecology.org/document/d/199eSBGlAVZpeICAyxhrwKUvEk83Gqo31pMXF4_YxLv0/edit#heading=h.9f0xjban85oc] | ||
*Workshop food program - [https://docs.google.com/a/opensourceecology.org/document/d/1hr1A1PBk9p-x55zEPvvoLREjGSgruVU7mlyvyl5gLAI/edit] | *Workshop food program - [https://docs.google.com/a/opensourceecology.org/document/d/1hr1A1PBk9p-x55zEPvvoLREjGSgruVU7mlyvyl5gLAI/edit] |
Revision as of 13:39, 14 April 2014
Requirements and Priorities
Landscape Architecture Needs and Requirements
1. Access Road to HabLab
- Includes drainage tubes, 2 - 12' long
- Parking lot before 2nd creek
- Ability to turn around in front of HabLab
- Accommodate porch/patio for HabLab
2. Foundation Plan for Electronics Workshop
- Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse
- Footprint is 48x48' for the main building (9 bays of 16'x16')
- Leanto on North Side - heavy equipment storage - 3 bays of 16'x16'
- Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage
3. Swimming Pool - grading + landscaping
- Design of pool, deck, chair area, landscaping around it
- Water and electric connections
4. Summer Camp Area
- Select location, design floor plan + structure
- Design a post-and-beam platform
- Water + electrical connection
5. Microhouse Additions
- Grade for modules 2-6, otherwise, use LifeTrac for 2-3
HabLab
Bunk Beds
See Bunk Bed - includes Sketchup.
Summer Camp
Files
File:Summer camp gathering space 2014.skp
File:Summer camp gathering space2013.skp
File:Summer camp gathering space version 8.skp
General Plan
Site Concept Plan
Execution Gantt - [1]
Site Concept Execution
Hablab
Spring Break Plan
Work Links
- Prep for April Workshops - [2]
- MH Addition requirements - [3]
- Workshop food program - [4]
- April 3 Week Plan - [5]
- April Workshops planning - [6]
- FeF Infrastructure Schedule for Interns
- Tasks Checklist for June 1, 2014 - execution Gantt - [7]
- FeF Infrastructure Improvements
- Infrastructure Shopping List
- Summer of 2012 water and internet line trenching