Extreme Onboarding: Difference between revisions
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
*Bring: tripod for smart phone time lapse | *Bring: tripod for smart phone time lapse | ||
=Establishing Team Workflow= | =Establishing Team Workflow= | ||
Everyone keeps a log of their activity, and core work revolves around collaboratively-produced and organized | Everyone keeps a log of their activity, and core work revolves around collaboratively-produced and organized content. All work is linked on Dozuki - to attain clarity on phases: (1) background, (2) concept design, (3) techincal design, (4) build, and (5) testing/next iterations. Documentation continues throughout the process. Team begins to take on specialized, consistent roles with time: | ||
*'''Team Video Producer''' - produces screen captures, takes timelapses and adds music, produces video instructionals. Words with CAD team to produce FreeCAD walkthroughs and part-by-part hide/unhide assemblies. '''Output''': one solid video per week, working from their footage, and collating footage of all uploads. Maintains a repository of open source soundtracks. | *'''Team Video Producer''' - produces screen captures, takes timelapses and adds music, produces video instructionals. Words with CAD team to produce FreeCAD walkthroughs and part-by-part hide/unhide assemblies. '''Output''': one solid video per week, working from their footage, and collating footage of all uploads. Maintains a repository of open source soundtracks. | ||
*Media Manager: Pull reel and upload of 250MB every night to YouTube, and 5GB/week on Vimeo. 500K upload speed indicates. Oversees that everyone is uploading YouTube videos, and coaches late adopters. | *Media Manager: Pull reel and upload of 250MB every night to YouTube, and 5GB/week on Vimeo. 500K upload speed indicates. Oversees that everyone is uploading YouTube videos, and coaches late adopters. |
Revision as of 02:04, 22 May 2014
Tools
- Wiki: Learn wiki usage - log, file uploads
- Browser: Tab with Dozuki Modules, your Work Log
- Google Docs: learn how to Embed Page in wiki
- Internet: Create Work Log, Log Your Contributions, Join Design Sprints on specific topics, Join Mailing List on a specific topic, Add Yourself to a Team List.
- Computer: Download and install Ubuntu 12.04, FreeCAD, LibreCAD, GIMP, OpenShot, RecordMyDesktop, Trovebox, Dozuki, Fritzing, and
- Smart phone or Tablet: Download Dozuki, Trovebox, Time Lapse camera if you don't have it. We will have 6 tablets available for documentation. We will have 2 internet lines available +
- CAD: Learn Sketchup, Sweet Home 3D, FreeCAD, LibreCAD, Fritzing, and Blender file conversion.
- Media and Animation: OpenShot, RecordMyDesktop, Trovebox, GIMP, Inkscape, Blender, and Open Source 2D Animation Software.
- Bring: tripod for smart phone time lapse
Establishing Team Workflow
Everyone keeps a log of their activity, and core work revolves around collaboratively-produced and organized content. All work is linked on Dozuki - to attain clarity on phases: (1) background, (2) concept design, (3) techincal design, (4) build, and (5) testing/next iterations. Documentation continues throughout the process. Team begins to take on specialized, consistent roles with time:
- Team Video Producer - produces screen captures, takes timelapses and adds music, produces video instructionals. Words with CAD team to produce FreeCAD walkthroughs and part-by-part hide/unhide assemblies. Output: one solid video per week, working from their footage, and collating footage of all uploads. Maintains a repository of open source soundtracks.
- Media Manager: Pull reel and upload of 250MB every night to YouTube, and 5GB/week on Vimeo. 500K upload speed indicates. Oversees that everyone is uploading YouTube videos, and coaches late adopters.
- Trovebox Manager: Oversees that entire team is doing media uploads to Trovebox.
- Google Presentation Instructional Producer: takes CAD, Trovebox assets, and video screen shots to produce step-by-step instructionals
- Collaborative Documentation: everyone on team works with Google Presentation to make content modules of 12-24 pages for each development project
- Documentation Manager: Assures assets are uploaded daily.
- Logger and Design Sprint Manager: Updates Project Log/Status for current
- 3D Printer Manager: does prototype prints
- Welder manager: maintains and reports regularly on status of all welders
- CNC Table Manager: maintains and upgrades the CNC torch/router table.
- Architecture Manager: Assures that everyone learns the full chain of library-based, module-based design for framed, brick, and CNC architecture. Works with CNC Router Table
- Hospitality Manager: Assures that all roles are being fulfilled, and reports to product lead on all status
- Graphics Artist: Produces templates for OSE Manuals
- Duties: Garbage takeout; recycling to town; propane refills; HabLab weekly cleaning.
- Morning meeting - Go over everyone's log publicly - 5 min - dynamic view of progress; critical that everyone uploads daily. Then discussion of the day's work.
Advanced
- Graduating to Organizing a Workshop for 50/50 revenue share.