Ball Screw: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:
*425 oz in = 27 lb at inch or 54 at 1/2" of 1" shaft. Pitch of 1/4 inch means 12 mech adv or 650 lb of push minus inefficiencies.
*425 oz in = 27 lb at inch or 54 at 1/2" of 1" shaft. Pitch of 1/4 inch means 12 mech adv or 650 lb of push minus inefficiencies.
*what is torque limit of 1/2" ball screw?
*what is torque limit of 1/2" ball screw?
=Heavy Steel Slab=
*It is $3/lb for 10"x2' or 133 lb - [http://www.mcmaster.com/#9143k744/=tf6qwv]

Revision as of 18:51, 24 August 2014

  • $136 for 4 feet of 1" screw. 1/4" pitch - means fast travel. -[1]

calculations

  • 425 oz in = 27 lb at inch or 54 at 1/2" of 1" shaft. Pitch of 1/4 inch means 12 mech adv or 650 lb of push minus inefficiencies.
  • what is torque limit of 1/2" ball screw?

Heavy Steel Slab

  • It is $3/lb for 10"x2' or 133 lb - [2]