=Test-Driven Requirements=
 
*Water, septic tank, outdoor water hydrant, external 200A breaker and connection point for downstream 200A circuit, internet line
*Documentation of all line paths and burial depths
*Direct connection from street breaker panel to MicroHouse
*Use 0000 aluminum cable for power
*Attend to crossing points of internet, and attend to location of deeper water lines
*1" poly pipe for water
*Power cable depth of 18"
*Water line depth of 36"
*Internet line depth of 18"
*Water teed into Hablab, and teed off for MicroHouse 3
*Underground water fittings are buried directly using corrosion-free fittings
*Leave provision for further extension of power grid from MicroHouse 3

Revision as of 16:41, 7 September 2014

Test-Driven Requirements

  • Water, septic tank, outdoor water hydrant, external 200A breaker and connection point for downstream 200A circuit, internet line
  • Documentation of all line paths and burial depths
  • Direct connection from street breaker panel to MicroHouse
  • Use 0000 aluminum cable for power
  • Attend to crossing points of internet, and attend to location of deeper water lines
  • 1" poly pipe for water
  • Power cable depth of 18"
  • Water line depth of 36"
  • Internet line depth of 18"
  • Water teed into Hablab, and teed off for MicroHouse 3
  • Underground water fittings are buried directly using corrosion-free fittings
  • Leave provision for further extension of power grid from MicroHouse 3