MicroHouse 4 Utilities: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 14: | Line 14: | ||
*Leave provision for further extension of power grid from MicroHouse 3 | *Leave provision for further extension of power grid from MicroHouse 3 | ||
<html></html> | <html><iframe src="https://docs.google.com/presentation/d/1y-9BG601ZPE_ma4FQ6YH-UpgXmTKmFfKlC5PFDVrqQE/embed?start=false&loop=false&delayms=3000" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html> |
Revision as of 16:44, 7 September 2014
Test-Driven Requirements
- Water, septic tank, outdoor water hydrant, external 200A breaker and connection point for downstream 200A circuit, internet line
- Documentation of all line paths and burial depths
- Direct connection from street breaker panel to MicroHouse
- Use 0000 aluminum cable for power
- Attend to crossing points of internet, and attend to location of deeper water lines
- 1" poly pipe for water
- Power cable depth of 18"
- Water line depth of 36"
- Internet line depth of 18"
- Water teed into Hablab, and teed off for MicroHouse 3
- Underground water fittings are buried directly using corrosion-free fittings
- Leave provision for further extension of power grid from MicroHouse 3