Roof Metal and Flashing: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(Moved some content to a more fitting page) |
||
Line 5: | Line 5: | ||
Flashing should be bent at 83 degrees for 42', and 97 degrees for 15 feet. | Flashing should be bent at 83 degrees for 42', and 97 degrees for 15 feet. | ||
*Lay metal roofing over the wooden frame and fasten the roofing onto the wooden beams using fasteners that tighten for a water-tight, weather-resistant seal. Be sure to leave plenty of overhang (~3ft) because CEB walls are susceptible to precipitation. |
Latest revision as of 22:10, 21 August 2021
For microhouse 4, 19 roof sections are needed:
- 5 are 18'6" long
- 14 are 18' long
Flashing should be bent at 83 degrees for 42', and 97 degrees for 15 feet.
- Lay metal roofing over the wooden frame and fasten the roofing onto the wooden beams using fasteners that tighten for a water-tight, weather-resistant seal. Be sure to leave plenty of overhang (~3ft) because CEB walls are susceptible to precipitation.