XM Prusa i3 Procedure: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
#Make frame of 4 2020s plus vertical angles. QC - long pieces front and back, short are superior of the front. | #Make frame of 4 2020s plus vertical angles. QC - long pieces front and back, short are superior of the front. | ||
#Add vertical frame. Assemble z flat, then stand it up. Use a | #Add vertical frame. Assemble z flat, then stand it up. Use a standard combination square. |
Revision as of 06:00, 2 February 2016
XM process revolves around leaning out the build so QC is prioritized early on, with as many QC steps frontloaded as possible. This allows steps of lesser importance to be carried out later in the process - allowing for fatigue only later in the day.
Frontloading QC allows for full attention to be given to QC.
Base steps:
- Make frame of 4 2020s plus vertical angles. QC - long pieces front and back, short are superior of the front.
- Add vertical frame. Assemble z flat, then stand it up. Use a standard combination square.