D3D Inventory: Difference between revisions
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
#Female end of power plug is cut | #Female end of power plug is cut | ||
#Strip 2" off power plug end, strip off 2 cm off individual wires | #Strip 2" off power plug end, strip off 2 cm off individual wires | ||
=Final Prep= | |||
#Upload control code | |||
#Prepare Inventory Cheat Sheets for workshop | |||
#Solder the height probe diode and tin wire ends | |||
#Prepare aluminum plates |
Revision as of 22:35, 17 March 2016
Unpacking
It took 10 hours to unpack 12 Folgertech Kits:
- Separate bolts by size
- Separate every part by one of 10 Modules as at Prusa i3 Build Optimization
Further Prep
- Put set screws into L brackets (24 set screws per machine)
- Separate aluminum beams and unwrap, then tape together into a bunch
- Take bags off all aluminum bushing blocks
- Put on jumpers onto controller boards
- Put on stepper drivers onto controllers
- Bend up the transistors on stepper drivers
- Take backing off all plexiglas
- Wiring bundle - separate wires
- One pair of 22 ga thin wires goes to extruder
- Long piece of 16 ga wires goes to heated bed box
- 2 pairs of 7" 16 ga wire go to power supply
- Female end of power plug is cut
- Strip 2" off power plug end, strip off 2 cm off individual wires
Final Prep
- Upload control code
- Prepare Inventory Cheat Sheets for workshop
- Solder the height probe diode and tin wire ends
- Prepare aluminum plates