=Tentative Schedule - March 2018=
=Tentative Schedule - March 2018=


*June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit.
*June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit. See Notes.


*June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller. Needs [[Open Source Superefficient Refrigerator Conversion]].
*June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller. Needs [[Open Source Superefficient Refrigerator Conversion]].
*July (August?) 13-15 - Aquaponics Workshop 2 - pending mastery of June 1-3
*August 17-19 - Aquaponics Workshop 2.
*Nov 2-7 - Utah Build. Critical requirements: 3 month cutoff at Aug 1 for Foundation and Bricks. Foundation to spec, and 6000 bricks pressed. OSE consults with Client's Foundation Contractor. OSE comes for a training visit on CEBs, and foundation inspection + 360 degree embed. Floor level laser shot, and filled with sand + PEX if want hydronics. (152 feet of wall - 11 wall sections = 108 feet of wall. 5400 4x6x12 block or 864 cubic feet. See [[Bricks in a Wall]]. Partial bricks must be pressed. Client pulls permits, OSE sends necessary documents. OSE prepares Builder Pack. Creates a Publication, "How to Organize an Extreme Build of the Seed Eco-Home." Further provides a 3D tour. OSE provides thermal imagining of final house with [[Open Source Thermal Camera]]
*Nov 2-7 - Utah Build. Critical requirements: 3 month cutoff at Aug 1 for Foundation and Bricks. Foundation to spec, and 6000 bricks pressed. OSE consults with Client's Foundation Contractor. OSE comes for a training visit on CEBs, and foundation inspection + 360 degree embed. Floor level laser shot, and filled with sand + PEX if want hydronics. (152 feet of wall - 11 wall sections = 108 feet of wall. 5400 4x6x12 block or 864 cubic feet. See [[Bricks in a Wall]]. Partial bricks must be pressed. Client pulls permits, OSE sends necessary documents. OSE prepares Builder Pack. Creates a Publication, "How to Organize an Extreme Build of the Seed Eco-Home." Further provides a 3D tour. OSE provides thermal imagining of final house with [[Open Source Thermal Camera]]



Revision as of 15:29, 22 March 2018

Tentative Schedule - March 2018

  • June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit. See Notes.
  • June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller. Needs Open Source Superefficient Refrigerator Conversion.
  • August 17-19 - Aquaponics Workshop 2.
  • Nov 2-7 - Utah Build. Critical requirements: 3 month cutoff at Aug 1 for Foundation and Bricks. Foundation to spec, and 6000 bricks pressed. OSE consults with Client's Foundation Contractor. OSE comes for a training visit on CEBs, and foundation inspection + 360 degree embed. Floor level laser shot, and filled with sand + PEX if want hydronics. (152 feet of wall - 11 wall sections = 108 feet of wall. 5400 4x6x12 block or 864 cubic feet. See Bricks in a Wall. Partial bricks must be pressed. Client pulls permits, OSE sends necessary documents. OSE prepares Builder Pack. Creates a Publication, "How to Organize an Extreme Build of the Seed Eco-Home." Further provides a 3D tour. OSE provides thermal imagining of final house with Open Source Thermal Camera

Tentative Schedule - November 2017

  • Feb 15 - CNC Torch Table Build
  • March 1 - 3D Printer Build, Saudi Arabia?
  • March 15 - CEB Press + Soil Conditioner + Tractor Build, Costa Rica
  • April 1 - 3D Printer Build
  • April 15 - 64 hp tractor build
  • May - Aquaponic Greenhouse Build
  • June - CEB Press build
  • July - MicroTractor Build
  • August - House Build