CEB Press/Manufacturing Instructions/Soil grate: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with " == Tools Required == == Materials Required == == Diagrams == == Fabrication Steps ==")
 
Line 5: Line 5:


== Materials Required ==
== Materials Required ==
 
*1/4”x2”x2” angle, 6' (2)
*1/4”x2”x2” angle, 3' (2)
*1/4”x2” bar, 71.5”
*3/8” rebar, 105'


== Diagrams ==
== Diagrams ==

Revision as of 03:56, 21 April 2011

Tools Required

Materials Required

  • 1/4”x2”x2” angle, 6' (2)
  • 1/4”x2”x2” angle, 3' (2)
  • 1/4”x2” bar, 71.5”
  • 3/8” rebar, 105'

Diagrams

Fabrication Steps