OSE Campus Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "=Wed Apr 29, 2020= *Funding: $100k for land, mvp. Paid back in 5 years at 20% angel investor return. *Operations: microfactory, self-funded through 1 month workshop. 24 partic...")
 
No edit summary
Line 1: Line 1:
=Wed Apr 29, 2020=
=Wed Apr 29, 2020=
*Funding: $100k for land, mvp. Paid back in 5 years at 20% angel investor return.
*Funding: $100k for land, mvp. Paid back in 5 years at 20% angel investor return.
*Operations: microfactory, self-funded through 1 month workshop. 24 participants minimum. Week 0: rooftop shed including PV and Water Collection. Week 1: Microfactory: 3D printers and CNC torch, and Screw Machine: house, plastic, and metal. Week 2: Extreme Machine builds - a tractor, power cube, brick press, and sawmill. Week 3:  Week 3 perennial polyculture, Afforestt, and agriculture. buildout. Week 4: House and Aquaponic Greenhouse. Inludes 100% off-grid with saturated water and auto-turnon generator.
*Startup Operations via a series of Extreme Manufacturing Workshops: microfactory, self-funded through 1 month workshop. 24 participants minimum. Week 0: rooftop shed including PV and Water Collection. Week 1: Microfactory: 3D printers and CNC torch, and Screw Machine: house, plastic, and metal. Week 2: Extreme Machine builds - a tractor, power cube, brick press, and sawmill. Week 3:  Week 3 perennial polyculture, Afforestt, and agriculture. buildout. Week 4: House and Aquaponic Greenhouse. Inludes 100% off-grid with saturated water and auto-turnon generator.
*Marketing: Extreme Manufacturing Workshops must be orchestrated well.

Revision as of 20:01, 29 April 2020

Wed Apr 29, 2020

  • Funding: $100k for land, mvp. Paid back in 5 years at 20% angel investor return.
  • Startup Operations via a series of Extreme Manufacturing Workshops: microfactory, self-funded through 1 month workshop. 24 participants minimum. Week 0: rooftop shed including PV and Water Collection. Week 1: Microfactory: 3D printers and CNC torch, and Screw Machine: house, plastic, and metal. Week 2: Extreme Machine builds - a tractor, power cube, brick press, and sawmill. Week 3: Week 3 perennial polyculture, Afforestt, and agriculture. buildout. Week 4: House and Aquaponic Greenhouse. Inludes 100% off-grid with saturated water and auto-turnon generator.
  • Marketing: Extreme Manufacturing Workshops must be orchestrated well.