Underground Utilities: Difference between revisions
Jump to navigation
Jump to search
(Created Page + Added Basic Sections/Info) |
(Moved some stuff around) |
||
Line 6: | Line 6: | ||
**In an above ground "Utility tunnel floor" needs a better name, [https://en.wikipedia.org/wiki/Disney_utilidor_system it's what disneyland orlando does due to florida's water table not allowing for a lower floor] | **In an above ground "Utility tunnel floor" needs a better name, [https://en.wikipedia.org/wiki/Disney_utilidor_system it's what disneyland orlando does due to florida's water table not allowing for a lower floor] | ||
=List of Potential Utilities= | =List of Potential Utilities at Neighborhood Level= | ||
==Electricity== | |||
*"Standard" mains power (ie the non-3 phase variety of the standard local AC power) | |||
*3 phase ac | |||
*other power forms (hv dc, other non-standard forms etc, probably not relevant) | |||
==Water== | |||
*Fresh Water (tap water) | |||
*Grey Water Out (if a central recycling system is in use) | |||
*Reclaimed Water In (essentially grey water in) often used for yard irragation while spending less potable water | |||
==Gas== | |||
*Fuel Gas (most likely compressed methane) | |||
**Could also be syngas, hydrogen, or a blend | |||
*Most others probably won't be done, but perhaps for a seperate building level list? | |||
==Data== | |||
*Dedicated Telephone (good for redundancy if cellular or voip go down) | |||
*Fiber Internet | |||
==Waste== | |||
*Sewer | |||
*[[Pneumatic Waste Collection]] | |||
**Could be combined, seperate recycling + compost lines etc | |||
==Misc== | |||
* | * | ||
Revision as of 00:56, 6 May 2020
Basics
- The practice of placing all the various utilities pipes and cables below ground
- This can be:
- Buried
- In a Utility tunnel
- In an above ground "Utility tunnel floor" needs a better name, it's what disneyland orlando does due to florida's water table not allowing for a lower floor
List of Potential Utilities at Neighborhood Level
Electricity
- "Standard" mains power (ie the non-3 phase variety of the standard local AC power)
- 3 phase ac
- other power forms (hv dc, other non-standard forms etc, probably not relevant)
Water
- Fresh Water (tap water)
- Grey Water Out (if a central recycling system is in use)
- Reclaimed Water In (essentially grey water in) often used for yard irragation while spending less potable water
Gas
- Fuel Gas (most likely compressed methane)
- Could also be syngas, hydrogen, or a blend
- Most others probably won't be done, but perhaps for a seperate building level list?
Data
- Dedicated Telephone (good for redundancy if cellular or voip go down)
- Fiber Internet
Waste
- Sewer
- Pneumatic Waste Collection
- Could be combined, seperate recycling + compost lines etc
Misc
Current Layout + Marking Standards
OSE Standard
- May not be done, but if so would be all of the utilities in the ose ecosystem in a standardized underground, easily maintainable layout