David Lemmer: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
*[[Extreme_Enterprise_Event_Design#Pre-Preparation]]
*[[Extreme_Enterprise_Event_Design#Pre-Preparation]]
*Start with Definition of Done
*Start with Definition of Done
*
*Metrics - how do you measure if the process went well.
**Number of modules successfully produced
**Metric - number of people, and proper teams that showed up.

Revision as of 22:26, 14 July 2020

  • AFIT - Air Force Institute of Technology . Ohio.
  • Systems Engineering Masters - model-based systems engineering. Systems engineering - before it used to be document based.
  • Extreme_Enterprise_Event_Design#Pre-Preparation
  • Start with Definition of Done
  • Metrics - how do you measure if the process went well.
    • Number of modules successfully produced
    • Metric - number of people, and proper teams that showed up.