Seed Home 2 Planning: Difference between revisions
Jump to navigation
Jump to search
m (Marcin moved page Execution 2020 to Seed Home 2 Planning) |
No edit summary |
||
Line 1: | Line 1: | ||
=Seed Home 2 Planning= | |||
This is the Critical Path in the Preparation Phase. | |||
Key aspects to solve: | |||
*Critical is the support for vetting Owner-Builders. | |||
*Team of 4 vetters proposed. | |||
*Ideally the support team produces the blazing-fast 24 videos - 12 on dev method, 12 on the technology of House: | |||
=Onboarding Videos= | |||
*OSE Linux - super short | |||
*FreeCAD 101 - exists. But redone for OSE Linux | |||
*Wiki, Work Log, Embedded Docs, Embedded Videos, Live Editable Docs, Part Libraries | |||
*FreeCAD Part Libraries on the Wiki | |||
* | |||
Based on [[Seed Home 2 Critical Path]]: | Based on [[Seed Home 2 Critical Path]]: | ||
<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vS_JYNgaYEEHX576hjYEIRz2iCpBrHiJ63MhCzSEHtpprDnGh4VaMEt4eUH4kATW9INrsM2xXdRpxDg/embed?start=false&loop=false&delayms=3000" frameborder="0" width="701" height="423" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | <html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vS_JYNgaYEEHX576hjYEIRz2iCpBrHiJ63MhCzSEHtpprDnGh4VaMEt4eUH4kATW9INrsM2xXdRpxDg/embed?start=false&loop=false&delayms=3000" frameborder="0" width="701" height="423" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> |
Revision as of 16:11, 21 August 2020
Seed Home 2 Planning
This is the Critical Path in the Preparation Phase.
Key aspects to solve:
- Critical is the support for vetting Owner-Builders.
- Team of 4 vetters proposed.
- Ideally the support team produces the blazing-fast 24 videos - 12 on dev method, 12 on the technology of House:
Onboarding Videos
- OSE Linux - super short
- FreeCAD 101 - exists. But redone for OSE Linux
- Wiki, Work Log, Embedded Docs, Embedded Videos, Live Editable Docs, Part Libraries
- FreeCAD Part Libraries on the Wiki
Based on Seed Home 2 Critical Path:
Strategy
Welding
Basic parameters:
- Professional weld shops charge $60-75/hr around Missouri. That is scalable and replicable, but redundant in terms of paying overhead when we have onsite facilities.
- One can hire someone. Welders get paid $18-27 (mean, top 10%) in Missouri. This is a cost-effective route compared to hiring a fab shop, if one has their own equipment.
- Thus, with OSE design, designs can be fabricated.
- Welder search - by reference.
Weld Budget
- Tractor: time of 40 hours for LifeTrac can thus cost between $720 and $1080, as opposed to $2400 for the outsource to a fab shop. From here, take $20/hr.
- Changfa Power Cube
- Helical Piers: 7 hours for a set of piers @15 minutes each - $140 for welding.
- Pile Driver - 8 hrs - $160
- MicroTrac - 40 hours of welding - $800
- Baler - 40 hrs - $800
- Rake - 8 hrs - $160.
- Mower - 40 hrs
- Brush Hog, Microtrac - 40 hrs
- Brush Hog - LifeTrac - 40 hrs
Design
- OSE module-based design is most effective.
- Execution for CNC machines requires 3D printing, best done with D3D Pro 3 for larger prints.
- Thus, design the following things:
- Tractor - bobcat style life LifeTrac v17.10
- Diesel power cube
- 3x geardown for OSE Universal Rotor with pile-driving attachment. Geardown can also be used for tractor drive.
- P2 pile - up to 10'
- Microtrac - with mower, tiller, small round baler, rake, and cutter. Decrease track width possibly to 8" on both LifeTrac and MicroTrac.
- Mower - Rotary Disk Mower.
- Rake -
- Baler - simple
- Brushhog