Building Permits: Difference between revisions
Jump to navigation
Jump to search
(→Time) |
|||
Line 6: | Line 6: | ||
=Procedure= | =Procedure= | ||
*You call up to invite the inspector on site. [http://www.permitsprotect.info/homeowners/permit-inspection-process/index.htm] | *Get plans approved. | ||
*Build. You call up to invite the inspector on site. [http://www.permitsprotect.info/homeowners/permit-inspection-process/index.htm] | |||
*Utility release - after final inspection, when you are allowed to connect utilities. | |||
=Time= | =Time= | ||
*Ex. 4 weeks to approve plans - [http://www.slocity.org/home/showdocument?id=3878] | *Ex. 4 weeks to approve plans - [http://www.slocity.org/home/showdocument?id=3878] | ||
*Inspection record card shows all the inspections required - [http://www.slocity.org/home/showdocument?id=3878] | *Inspection record card shows all the inspections required - [http://www.slocity.org/home/showdocument?id=3878] |
Revision as of 16:32, 22 October 2020
Cost
Building permit costs range from $100 on the low end to the $3000 range.
http://www.homeadvisor.com/cost/architects-and-engineers/get-a-building-permit/
Procedure
- Get plans approved.
- Build. You call up to invite the inspector on site. [1]
- Utility release - after final inspection, when you are allowed to connect utilities.