*Or use island framing, where studs are no t continuous but only islands
*Or use island framing, where studs are no t continuous but only islands
*3" vent so ack is desirable, so we can go thru framing. OD is 3.5 leaving 1" on each side.
*3" vent so ack is desirable, so we can go thru framing. OD is 3.5 leaving 1" on each side.
*Second floor toilet pre-plumb leaves from the top of Panel 1, and bends towards 2nd floor toilet sweep. Latch door is pre-set in 2nd floor prior to vinyl floor.
*Second floor toilet pre-plumb leaves from the top of Panel 1, and bends towards 2nd floor toilet sweep. Latch door is pre-set in 2nd floor prior to vinyl floor. Location is digitized, so this is replicable.

Revision as of 22:24, 14 March 2021

  • Allow for 9 feet of flex from the top of stack vent so pipe has up to 2" of flex over the distance and thus can be prebuilt.
  • Are rubber couplers allowed?
  • Cap the top for extension to upper bathroom
  • Frame Panel 1 flat so there is sufficient space for a 3" vent stack, not 4"
  • Or use island framing, where studs are no t continuous but only islands
  • 3" vent so ack is desirable, so we can go thru framing. OD is 3.5 leaving 1" on each side.
  • Second floor toilet pre-plumb leaves from the top of Panel 1, and bends towards 2nd floor toilet sweep. Latch door is pre-set in 2nd floor prior to vinyl floor. Location is digitized, so this is replicable.