Jeff Higdon: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 5: Line 5:
*$8-11k/month for hauling
*$8-11k/month for hauling
*July  
*July  
*https://monolithicdome.com/david-b-south
*https://monolithicdome.com/david-b-south - David B South.
*$7k for insulated, 16' diameter dome - with ring foundation and floor, and walls, with aircrete for insulation for foundation - and to build up floor - otherwise it's concrete with styrofoam. They take a cement mixer. Use wood mulch - in mixer so styrofoam goes down into it. Aircrete Harry does the styrofoam concrete.

Revision as of 23:22, 16 April 2021

See instructors for Summer X 2021

Notes

  • $8-11k/month for hauling
  • July
  • https://monolithicdome.com/david-b-south - David B South.
  • $7k for insulated, 16' diameter dome - with ring foundation and floor, and walls, with aircrete for insulation for foundation - and to build up floor - otherwise it's concrete with styrofoam. They take a cement mixer. Use wood mulch - in mixer so styrofoam goes down into it. Aircrete Harry does the styrofoam concrete.