Skills required:
Skills required:
*'''Design''' - ability to take full CAD model and view it, extract dimensions, and generate cross sections for build details.
*'''Design''' - ability to take full CAD model and view it, extract dimensions, and generate cross sections for build details.
*'''Foundation''' - grading using a bobcat, backhoe. Laser level and triangulation for corners. Ins and outs of form making, form assembly, rebar, vapor barrier, and shallow insulated footer.
*'''Foundation''' - grading using a bobcat, backhoe. Laser level and triangulation for corners. Ins and outs of form making, form assembly, rebar, vapor barrier, and shallow insulated footer. Installing insulation, mudsill anchors, and accommodating rough-in plumbing.
*'''Plumbing''' - understanding the design and building rough plumbing, and pressure testing for 5 psi for 15 minutes.  
*'''Plumbing''' - understanding the design and building rough plumbing, and pressure testing for 5 psi for 15 minutes.  
*'''Concrete Pour''' - ordering concrete, calculating concrete volume. Screeing, magnesium float, hand troweling, power trowel, watering, and protecting.
*'''Concrete Pour''' - ordering concrete, calculating concrete volume. Screeing, magnesium float, hand troweling, power trowel, watering, and protecting.
*'''Concrete Polishing''' - using polishing buffers, going from 50-3000 grit for a shiny floor, including concrete densifier.  
*'''Concrete Polishing''' - using polishing buffers, going from 50-3000 grit for a shiny floor, including concrete densifier.  
*'''Foundation to Wall Detail''' - waterproof, air proof details for junction from cement slab to walls
*'''Foundation to Wall Detail''' - waterproof, air proof details for junction from cement slab to walls. Includes insulation,
*'''Walls''' - making pre-finished wall modules with included utilities and ability to assemble them and align them up to the top plate.
*'''Walls''' - making pre-finished wall modules with included utilities and ability to assemble them and align them up to the top plate.
*'''First Floor Ceiling''' - Installing joists for a second floor, with ceiling sheething
*'''First Floor Ceiling''' - Installing joists for a second floor, with ceiling sheething
Line 16: Line 16:
*'''Electrical''' - preinstalling electrical in wall panels, finishing with externa applainces such as lights and fans, and installing the utility power meter and panel.
*'''Electrical''' - preinstalling electrical in wall panels, finishing with externa applainces such as lights and fans, and installing the utility power meter and panel.
*'''PV''' - installing an off-grid power system with transfer switch, not utility intertie.
*'''PV''' - installing an off-grid power system with transfer switch, not utility intertie.
*Heat Pump - installing a split-air heat pump and connecting the necessary plumbing and electrical, prebuilding some of this into the wall modules. Hanging the heat pump on an exterior wall.

Revision as of 18:43, 2 May 2021

Skills required:

  • Design - ability to take full CAD model and view it, extract dimensions, and generate cross sections for build details.
  • Foundation - grading using a bobcat, backhoe. Laser level and triangulation for corners. Ins and outs of form making, form assembly, rebar, vapor barrier, and shallow insulated footer. Installing insulation, mudsill anchors, and accommodating rough-in plumbing.
  • Plumbing - understanding the design and building rough plumbing, and pressure testing for 5 psi for 15 minutes.
  • Concrete Pour - ordering concrete, calculating concrete volume. Screeing, magnesium float, hand troweling, power trowel, watering, and protecting.
  • Concrete Polishing - using polishing buffers, going from 50-3000 grit for a shiny floor, including concrete densifier.
  • Foundation to Wall Detail - waterproof, air proof details for junction from cement slab to walls. Includes insulation,
  • Walls - making pre-finished wall modules with included utilities and ability to assemble them and align them up to the top plate.
  • First Floor Ceiling - Installing joists for a second floor, with ceiling sheething
  • 2nd Floor Finishing - sanded plywood, stained, varnished plank floor with acoustic underlayment.
  • 2nd Story Walls - building at height, these are procedures for using scaffolding and installing the second floor walls.
  • Interior Walls -
  • Bathroom - installing water heater, vent fan, shower, toilet, and sink
  • Kitchen Cabinets - selecting and installing cabinets and furnishings for the kitchen
  • Laundry - installing the laundry closet, washer, dryer, vent, and powering them from an appropriate outlet
  • Electrical - preinstalling electrical in wall panels, finishing with externa applainces such as lights and fans, and installing the utility power meter and panel.
  • PV - installing an off-grid power system with transfer switch, not utility intertie.
  • Heat Pump - installing a split-air heat pump and connecting the necessary plumbing and electrical, prebuilding some of this into the wall modules. Hanging the heat pump on an exterior wall.