OSE Botswana: Difference between revisions
Kenmakunga (talk | contribs) |
No edit summary |
||
Line 1: | Line 1: | ||
= | =OSE Botswana Plan= | ||
[[Africa Budget]], [[Africa Pilot]], Citizen Entrepreneurial Development Agency (CEDA)[https://www.ceda.co.bw/], Local Enterprise Authority (LEA)[http://www.lea.co.bw/] for funding. | [[Africa Budget]], [[Africa Pilot]], Citizen Entrepreneurial Development Agency (CEDA)[https://www.ceda.co.bw/], Local Enterprise Authority (LEA)[http://www.lea.co.bw/] for funding. | ||
=Business Plan Draft= | |||
https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit | |||
= | =Land Allocation= | ||
Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA) | Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA) | ||
Sample certificate of one of the plots of land allocated to Makunga Family members: [[File:Certificate of Customary Land Grant.pdf]] | Sample certificate of one of the plots of land allocated to Makunga Family members: [[File:Certificate of Customary Land Grant.pdf]] | ||
Line 10: | Line 12: | ||
---- | ---- | ||
= | =OSE Microfactory and Campus Botswana= | ||
Planning: | Planning: | ||
* need water - borehole? | * need water - borehole? |
Revision as of 19:41, 16 January 2022
OSE Botswana Plan
Africa Budget, Africa Pilot, Citizen Entrepreneurial Development Agency (CEDA)[1], Local Enterprise Authority (LEA)[2] for funding.
Business Plan Draft
https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit
Land Allocation
Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA) Sample certificate of one of the plots of land allocated to Makunga Family members: File:Certificate of Customary Land Grant.pdf
OSE Microfactory and Campus Botswana
Planning:
- need water - borehole?
- Power - Generator to power welders
- Foundation Slab - for workshop: 15m x 20m with roof.
- CEB press parts
- Toilets and showers
1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins. Need Site plan. CEB house plans, dorms and cabin plans. Bus in casual labourers to build infrastructure. Fly in MJ & CM for CEB build and other machines for workshop.