Earth Area Required for a Solar Economy: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
*This means one decade gets us 1.5TW - need a few decades. But this is accelerating.  
*This means one decade gets us 1.5TW - need a few decades. But this is accelerating.  
*'''OSE proposal - entrepreneurs get involved in PV module production en masse.'''
*'''OSE proposal - entrepreneurs get involved in PV module production en masse.'''
*Startup cost of PV manufacturing facility - couple million. See [https://www.academia.edu/8045076/How_to_setup_5MW_and_10MW_Solar_PV_Module_Manufacturing_Unit_-_Complete_Business_Model] - full breakdown. Initial capitalizatin appears to be spread out over an undefined period. Looks like facility would be somewhere around $2M in equipment? See example of laminator and facility. [https://ooitech.solar/Solar-Panel-Module-Production-Line/-r-19.html]. 5MW per year is typical, for about 40kW actual power use on laminator. 5MW = 250W*(20,000). 20k panels - or enough for 100 facilities of 50kW each.
*Startup cost of PV manufacturing facility - couple million. See [https://www.academia.edu/8045076/How_to_setup_5MW_and_10MW_Solar_PV_Module_Manufacturing_Unit_-_Complete_Business_Model] - full breakdown. Initial capitalizatin appears to be spread out over an undefined period. Looks like facility would be somewhere around $2M in equipment? See example of laminator and facility. [https://ooitech.solar/Solar-Panel-Module-Production-Line/-r-19.html]. 5MW per year is typical, for about 40kW actual power use on laminator. 5MW = 250W*(20,000). 20k panels - or enough for 100 facilities of 50kW each. In this model, the cost is 43 cents per watt, sale price is 64 cents per watt. This is in 2014, so it's a generation ago.

Revision as of 00:59, 18 February 2022

  • http://landartgenerator.org/pdf/PosterSolar.pdf
  • Cost would be $3-5 trillion, or a fraction of global GDP. [1]
  • Then to summarize, WTF is this not happening by next year?
  • Only 150 GW of panels are produced per year [2]
  • Average consumption is 350W per person for 8 billion people. [3]. This means 3 TW needed. But need to multiply by 4 as sun shines 6 hours on average on any place, World. So say it's about 10TW need.
  • This means one decade gets us 1.5TW - need a few decades. But this is accelerating.
  • OSE proposal - entrepreneurs get involved in PV module production en masse.
  • Startup cost of PV manufacturing facility - couple million. See [4] - full breakdown. Initial capitalizatin appears to be spread out over an undefined period. Looks like facility would be somewhere around $2M in equipment? See example of laminator and facility. [5]. 5MW per year is typical, for about 40kW actual power use on laminator. 5MW = 250W*(20,000). 20k panels - or enough for 100 facilities of 50kW each. In this model, the cost is 43 cents per watt, sale price is 64 cents per watt. This is in 2014, so it's a generation ago.