Foundation Plumbing Inspection: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
Notes: | Notes: | ||
*5 lb pressure on a | *5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [https://codes.iccsafe.org/content/IRC2012P13/chapter-25-plumbing-administration] | ||
=Sourcing= | |||
* |
Revision as of 07:02, 2 April 2022
- There may be an inspection during the foundation phase.
Notes:
- 5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [1]