Village Maintenance Schedule: Difference between revisions
Jump to navigation
Jump to search
(→Stock) |
|||
Line 12: | Line 12: | ||
**About 100 tires and track pieces - 100 lb each. 5 tons of rubber stock. at 5 tons cost per 50 years, | **About 100 tires and track pieces - 100 lb each. 5 tons of rubber stock. at 5 tons cost per 50 years, | ||
=Stock= | =Stock Available= | ||
*Stock steel sections available - 3" round shaft | *Stock steel sections available - 3" round shaft | ||
*Aluminum - 3" round shaft. | *Aluminum - 3" round shaft. |
Revision as of 22:20, 18 April 2022
Materials Production
- Gravel and rock for aluminum production, cement production, road base, foundation rock
- Foundation rock squares - quarry work
- Clay for CEB block, then stabilized, and for ceramics
- Biomass for fungal soil food web plumbing (mycelium as water conduit)
- Strawboard with endogenous lignin
Stock Production
- 3" billet cast then hot rolled to 3" shaft - in aluminum, steel, and
- TPU, TPO thermoplastic rubber stock with 80% recycle rate for tires, belts, other
- Tire and track maintenance cost goes down to about 2% loss per year for 50 year tires, reprinted at end of life
- About 100 tires and track pieces - 100 lb each. 5 tons of rubber stock. at 5 tons cost per 50 years,
Stock Available
- Stock steel sections available - 3" round shaft
- Aluminum - 3" round shaft.
Machines
- 3" automatic feed multimachine for precision parts for engines, 3D printers, cars, aviation, and high pressure pumps and vacuum pumps
- Basic Heavy Metal Workshop
- Wood shop.