=Sequence= | |||
*The rough inspection should be performed before the insulation is installed. This is not stated as a requirement, but a suggestion here. [https://www.bartowcountyga.gov/Typical%20Order%20of%20Inspections_06-17-16.pdf] | *The rough inspection should be performed before the insulation is installed. This is not stated as a requirement, but a suggestion here. [https://www.bartowcountyga.gov/Typical%20Order%20of%20Inspections_06-17-16.pdf] | ||
*Rough-in inspection can also occur after insulation is in, but it may be more difficult to perform inspection. [https://inspectusa.com/blog/pre-drywall-inspection-and-scheduling-inspection/#:~:text=A%20Pre%2Ddrywall%20inspection%20should,IN%E2%80%9D%20portion%20of%20the%20project.&text=When%20everything%20is%20100%25%20completed,signed%20off%2C%20ready%20for%20insulation.] | *Rough-in inspection can also occur after insulation is in, but it may be more difficult to perform inspection. [https://inspectusa.com/blog/pre-drywall-inspection-and-scheduling-inspection/#:~:text=A%20Pre%2Ddrywall%20inspection%20should,IN%E2%80%9D%20portion%20of%20the%20project.&text=When%20everything%20is%20100%25%20completed,signed%20off%2C%20ready%20for%20insulation.] | ||
*Thus - is there a separate inspection for insulation prior to all sheathing? | |||
=OSE Case= | =OSE Case= | ||
*No insulation covers any wiring or plumbing work. | *No insulation covers any wiring or plumbing work. |
Revision as of 22:43, 3 May 2022
Sequence
- The rough inspection should be performed before the insulation is installed. This is not stated as a requirement, but a suggestion here. [1]
- Rough-in inspection can also occur after insulation is in, but it may be more difficult to perform inspection. [2]
- Thus - is there a separate inspection for insulation prior to all sheathing?
OSE Case
- No insulation covers any wiring or plumbing work.
- Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing.
- Smoke detectors are required on the electrical side - [3]