SH4 Future Work: Difference between revisions
Jump to navigation
Jump to search
(Created page with "SH4 Future Work *Under stair closet door - redesign for modularity *Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater...") |
No edit summary |
||
Line 1: | Line 1: | ||
[[SH4 Future Work]] | [[SH4 Future Work]][[SH4 Challenges]] | ||
*Under stair closet door - redesign for modularity | *Under stair closet door - redesign for modularity | ||
*Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist? | *Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist? |
Revision as of 20:57, 22 January 2023
- Under stair closet door - redesign for modularity
- Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?