SH4 Future Work
SH4 Future Work. SH4 Challenges. Collaborative Design 2023. Neosubsistence. Interior Wall Build Process.
- SEH in 5 Trailer Loads
- SEH Coordinate System - to enable mass collaboration, it is important to understand basic CAD-BOM-Build considerations that facilitate module-based design. Front left foundation level is the origin. Everything follows from there. 2x6 design with headboard with bath tub size with utility wall determines location of any component from SEH Plumbing and SEH Electrical. SEH Digital Design Rules. Design Rules apply with CAD-BOM -Build Degeneracy development phase, while Design Guidelines can be interpreted to produce various versions.
- Investment model - matches S&P but transforms for neosubsistence while reconciles for greed.
- Under stair closet door - redesign for modularity
- Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?
- Wiring behind fridge - simplify for countertop UC on entire West wall?
- Finish all CAD - make everything interoperable and documented. On Part Library pages with clear instructions on what is what. Requires annotation. Requires file. Collates files in multiple formats. Shows visual representation.
- Dev team ecosystem - CAD and digital Fab with self-labeled parts. Joints in modules, standard parts between modules. This allows us to navigate through low requirement jurisdictions, building up experience for high requirement jurisdictions.