(Created page with "#Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.")
 
No edit summary
Line 1: Line 1:
#Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.
#Wall Interior 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1. Subfloor is drilled digitally for connection to module 4.

Revision as of 21:38, 22 January 2023

  1. Wall Interior 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1. Subfloor is drilled digitally for connection to module 4.