SH4 Future Work: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
(Blanked the page)
Line 1: Line 1:
[[SH4 Future Work]]. [[SH4 Challenges]]. [[Collaborative Design 2023]]. [[Neosubsistence]]. [[Interior Wall Build Process]].
 
*[[SEH in 5 Trailer Loads]]
*[[SEH Coordinate System]]
*Investment model - matches S&P but transforms for [[neosubsistence]] while reconciles for greed.
*Under stair closet door - redesign for modularity
*Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?
*Wiring behind fridge - simplify for countertop UC on entire West wall?
*Finish all CAD - make everything interoperable and documented. On Part Library pages with clear instructions on what is what. Requires annotation. Requires file. Collates files in multiple formats. Shows visual representation.
*Dev team ecosystem - CAD and digital Fab with self-labeled parts. Joints in modules, standard parts between modules. This allows us to navigate through low requirement jurisdictions, building up experience for high requirement jurisdictions.

Revision as of 20:30, 4 April 2023