**The first one is system grounding: the PV system with system voltage over 50 volts should be solidly system-grounded. | **The first one is system grounding: the PV system with system voltage over 50 volts should be solidly system-grounded. | ||
**The other one is the equipment grounding: the exposed non-currentcarrying metal parts of PV module frames, electrical equipment, and conductor enclosures should be grounded . | **The other one is the equipment grounding: the exposed non-currentcarrying metal parts of PV module frames, electrical equipment, and conductor enclosures should be grounded . | ||
*'''System Ground Howto''': To achieve that, the negative conductor usually is grounded via the GFPD in the PV inverter at point G | *'''System Ground Howto''': To achieve that, the negative conductor usually is grounded via the GFPD in the PV inverter at point G [https://ep-us.mersen.com/sites/mersen_us/files/2018-11/TT-PVPN1-Ground-Fault-Analysis-and-Protection-in-PV-Arrays-Tech-Topic.pdf]: | ||
[[File:PVsystemground.png]] | [[File:PVsystemground.png]] |
Revision as of 02:03, 16 September 2023
NEC 690 - Covers PV Systems
- 690.41 - Equipment Grounding Conductor requirements [1]
- 690.41(B) also requires ground fault protection except if there are no more than 2 strings (PV source circuits [2])
- Since NEC 2020, ground fault indicator must be readily visible (but not necessarily readily accessible?) [3]
- 690.45 - size of PV equipment grounding conductors - Table 250.122 + no less than 14 ga.
- 690.41(B) also requires ground fault protection except if there are no more than 2 strings (PV source circuits [2])
- 690.9(A) says that we don't need overcurrent device for PV if the wires can handle short current capacity of PV. But good luck trying to convince a code official.
- PV Grounding PDF [4]. Although the NEC does not specifically require all equipment to be certified/listed, many local jurisdictions and many AHJs establish requirements that all equipment be certified/listed because they feel unqualified to examine uncertified/unlisted equipment for safety as the NEC requires.
- Good overview doc. Read it from p. 6 on to understand equipment ground, system ground.
- Additional issue for PV is that in cloudy conditions, if you get a fault, a breaker may not trip because current is too low. For this reason, extra ground fault protection devices may be required.
- Is earth ground of a PV system connected to DC negative, or to AC neutral?
Ground Faults - System Grounding Howto
- Article says that a common ground fault protection device (GFPD) is a fuse to ground - [5]
- NEC Article 690.41 states that grounding for photovoltaic systems includes 2 grounds [6]:
- The first one is system grounding: the PV system with system voltage over 50 volts should be solidly system-grounded.
- The other one is the equipment grounding: the exposed non-currentcarrying metal parts of PV module frames, electrical equipment, and conductor enclosures should be grounded .
- System Ground Howto: To achieve that, the negative conductor usually is grounded via the GFPD in the PV inverter at point G [7]:
More
Solar PV standards and certifications - [8]. Class II means frames grounded, no system ground.
Paper on PV grounding, 1984. Fire safety and personnel safety are typically tradeoffs? [9]
- Solidly grounded means neutral is connected to earth electrode. [10]
- Class II system had double insulation and equipment ground, but no earth connection.
- Class I has equipment ground and earth connection.
- Insulation failures between current-carrying conductors and the ground are known as ground faults.
Classic video by Mike Holt. Equipment Grounding + system grounding - Ground and grounding electrode conductor basic with Mike Holt - [11]
- Do not earth ground frames with a ground rod like this - [12]
Equipment Grounding
- PV panels should follow electrical grounding conductor sizes - [13]
- Ie, for 30A DC, we need 10 ga ground.
- PV frames must be connected to PV system equipment grounding conductor [14]
- After leaving the PV array, the equipment ground must run together with the power wires. [15]
What Size Grounding Conductor on PV Panels?
- Australia rules - appear to say 6 ga for lightning protection, and 12 ga for frame grounding [16]