Integrated Scaling Strategy: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 5: Line 5:


=Core=
=Core=
*$25k vs 120k labor - 4.8x lower labor cost based on [[OSE Build Cost]]
*$25k vs 120k labor - 4.8x lower labor cost based on [[OSE Build Cost]].
*Formula: we give back 50% to the customer in added value, and 50% for the larger open source economy transition


=Unique Features=
=Unique Features=

Revision as of 19:00, 1 January 2024

edit


Core

  • $25k vs 120k labor - 4.8x lower labor cost based on OSE Build Cost.
  • Formula: we give back 50% to the customer in added value, and 50% for the larger open source economy transition

Unique Features

  • Integrated tools vBOM
  • Tool manufacturing
  • Materials Manufacturing