(Created page with "There is a phase of penetrations marking in the Seed Eco-Home Build. By principles of Contract-First Design, Design for Fiducials, Interface Design, and Poka...") |
No edit summary |
||
Line 1: | Line 1: | ||
There is a phase of penetrations marking in the [[Seed Eco-Home | There is a phase of penetrations marking in the [[Seed Eco-Home]] Build. By principles of [[Contract-First Design]], [[Design for Fiducials]], [[Interface Design]], and [[Poka Yoke]], we enforce a cohesive phase where penetrations are marked as a bulk process. | ||
There is at least one phase where penetrations are marked in outside walls. The bulk of them are marked and installed prior to the installation of interior modules, at which point various penetration locations are less accessible. If penetrations have fittings, such as the main stack vent - it is easier to install the fitting without interior walls in the way. | There is at least one phase where penetrations are marked in outside walls. The bulk of them are marked and installed prior to the installation of interior modules, at which point various penetration locations are less accessible. If penetrations have fittings, such as the main stack vent - it is easier to install the fitting without interior walls in the way. | ||
List of penetrations on exterior walls is here: [https://docs.google.com/presentation/d/1HqEL-KNTwGVzpZ4IUoZgkKPCX9_1ahXcBzTx9wZc1KY/edit#slide=id.g265d35ca864_0_67] | List of penetrations on exterior walls is here: [https://docs.google.com/presentation/d/1HqEL-KNTwGVzpZ4IUoZgkKPCX9_1ahXcBzTx9wZc1KY/edit#slide=id.g265d35ca864_0_67] |
Latest revision as of 20:35, 25 January 2024
There is a phase of penetrations marking in the Seed Eco-Home Build. By principles of Contract-First Design, Design for Fiducials, Interface Design, and Poka Yoke, we enforce a cohesive phase where penetrations are marked as a bulk process.
There is at least one phase where penetrations are marked in outside walls. The bulk of them are marked and installed prior to the installation of interior modules, at which point various penetration locations are less accessible. If penetrations have fittings, such as the main stack vent - it is easier to install the fitting without interior walls in the way.
List of penetrations on exterior walls is here: [1]