Basic Apprenticeship Resource Model: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
**At 1000 hours - 1 month per house. Now we get into logistics and organizational infrastructure requirements for scaled building: | **At 1000 hours - 1 month per house. Now we get into logistics and organizational infrastructure requirements for scaled building: | ||
***Automated design and blueprint generation required. | ***Automated design and blueprint generation required. | ||
***Turnkey blueprints required for streamlined code provision | |||
***3rd party inspector required at the 1000 hour, and possibly 2000 hour, case. Not needed in 3000 hour case. |
Revision as of 12:46, 12 February 2024
- Tuition pays for tools for participant, some prototyping materials, facility improvements, and 3 month runway.
- Worst case design:
- $12/hr and 3000 hours means 15 days of work, 200 hours each, done over 3 months. 3000 hours at $12=$36k in build time.
- Stipend allowable per apprentice: $12k per month of crew, $500/apprentice/month
- Industry standard design:
- 15 days of work over 3 months is low, with 10 hour per week rate. Can increase 3x to match industry standards for hours worked while in college
- At industry standard rate - we are at $1500/month stipend, competitive with lower end of graduate student stipend [1]
- Palatability - for young people, this could work. For old people with a family, it won't.
- Risk - 3000 hours is low risk, 3 months per house.
- At 2000 hours - 2 months per house
- At 1000 hours - 1 month per house. Now we get into logistics and organizational infrastructure requirements for scaled building:
- Automated design and blueprint generation required.
- Turnkey blueprints required for streamlined code provision
- 3rd party inspector required at the 1000 hour, and possibly 2000 hour, case. Not needed in 3000 hour case.