Apprenticeship Development Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "=Tue May 20, 2025= #Dozer rental for 20k sf building. Start BOM + design. Gravel cost - 1000 sf takes 1 truck at 4" =17.5 ton")
 
No edit summary
Line 1: Line 1:
=Tue May 20, 2025=
=Tue May 20, 2025=
#Dozer rental for 20k sf building. Start BOM + design. Gravel cost - 1000 sf takes 1 truck at 4" =17.5 ton
#Dozer rental for 20k sf building. Start BOM + design.  
#Gravel cost - 30k dg = $15k
#Building Cost - platform on edges with 8x16 units. See [[6_Bath_6_Shower#BOM]] for base platform

Revision as of 18:01, 20 May 2025

Tue May 20, 2025

  1. Dozer rental for 20k sf building. Start BOM + design.
  2. Gravel cost - 30k dg = $15k
  3. Building Cost - platform on edges with 8x16 units. See 6_Bath_6_Shower#BOM for base platform