Prepare Electrical System Components: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*[6] Cut lugs *Prepare battery to solenoid cable *Prepare solenoid to starter cable *Prepare ground cable *Cut battery cables to length, insert into lugs, and flatten *Drill lug ...") |
(Added a Category to the Page) |
||
Line 17: | Line 17: | ||
*Bolt on terminals | *Bolt on terminals | ||
[[Category:Fabrication Procedures]] | [[Category: Electronics]] [[Category: Fabrication Procedures]] |
Revision as of 05:40, 18 July 2021
- [6] Cut lugs
- Prepare battery to solenoid cable
- Prepare solenoid to starter cable
- Prepare ground cable
- Cut battery cables to length, insert into lugs, and flatten
- Drill lug holes
- Select solenoid location, drill frame, and attach solenoid to frame
- Prepare charging wire, attach charging wire extension to engine
- Wire up starter switch - kill wire, solenoid wire, power wire
- Select location for starter switch
- Install starter switch
- Prepare and weld on mount for throttle cable
- Attach throttle cable
- Build battery box
- Cut battery hold-down cable
- Secure battery to battery box
- Bolt on terminals