(Created page with "*From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. *From ist trac to decent looking to production skid steer at $25k sale price instead of $75k")
 
No edit summary
Line 1: Line 1:
*From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost.
*From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. Comically inefficient. Why doesn't it improve? Because at scale the designer (architect) does not design a house, and the user is not the builder (they are egged on by the builder for expensive (unbuildable) design).
*From ist trac to decent looking to production skid steer at $25k sale price instead of $75k
*From ist trac to decent looking to production skid steer at $25k sale price instead of $75k

Revision as of 19:39, 9 May 2026

  • From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. Comically inefficient. Why doesn't it improve? Because at scale the designer (architect) does not design a house, and the user is not the builder (they are egged on by the builder for expensive (unbuildable) design).
  • From ist trac to decent looking to production skid steer at $25k sale price instead of $75k