2026 Board Meeting Presentation
Jump to navigation
Jump to search
- From Ronny to 1005 Sycamore BHHS - side by side. At 100 vs 180 k build cost for materials and labor, and 1/3 the labor cost. Comically inefficient. Why doesn't it improve? Because at scale the designer (architect) does not design a house, and the user is not the builder (they are egged on by the builder for expensive (unbuildable) design).
- From 1st life trac to remote control production skid steer at $25k sale price instead of $90k for a commercial variant.
- From metacrisis to Ethical hyperagents
- FBA
- BCC
- Iconic CAD
- Iconic Tech stack: Solar Breeder Construction Set (power + process, start with hydrogen, metal, concrete impacting Global Energy Use), Materials Construction Set (Kiln), TCS, 3DPCS. Resto of stack includes Site Design (all infra + integ ag), Greenhouse, Nursery, Biogas/Septic fertigation, Thermal Bat.