Talk:CEB Press: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(→‎specs: new section)
No edit summary
Line 22: Line 22:


there is a line about hydraulic pressure, says 2000psi. should it be more like 545psi?
there is a line about hydraulic pressure, says 2000psi. should it be more like 545psi?
== Soils used to make CEBs ==
Has testing been done on a variety of soils?  Would it work with desert sand?  Are there tests someone could do with the machine to see what the specifications are for the CEBs produced using the soils on their specific lot?  I'm trying to help with documentation.  --[[User:Howard V. Agnew|Howard V. Agnew]] 01:09, 18 September 2011 (CEST)

Revision as of 23:09, 17 September 2011

there are some edits i was wanting to make to this page, is there a reason that it is locked? How are we to do a wiki redesign and categorization if pages are blocked?


We can use talk pages to suggest changes. Some pages are more sensitive than others. There may have been some vandalising. You might be a vandal 'cos you don't sign. ;-) LucasG 03:16, 29 October 2008 (PDT)


http://www.treehugger.com/files/2009/05/computer-and-robot-lay-bricks.php - Computer Lays the Prettiest Brick Walls Since Eladio Dieste - some artistic wall designs -- Will Norris 13 May 2009


Some links to literature about the manufacture and use of CEB

Compressed Earth Blocks Volume 1: Manual Of Production

Compressed Earth Blocks Volume 2: Manuel Of Design And Construction

Some further links at the AIDG website

specs

there is a line about hydraulic pressure, says 2000psi. should it be more like 545psi?

Soils used to make CEBs

Has testing been done on a variety of soils? Would it work with desert sand? Are there tests someone could do with the machine to see what the specifications are for the CEBs produced using the soils on their specific lot? I'm trying to help with documentation. --Howard V. Agnew 01:09, 18 September 2011 (CEST)